INSP-Final Inspection | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | FAIL |
Rick Jackson
|
|
|
julio; Phone #: ###-#### Internet Inspection Request from: Marc Lileks fire sprinkler control signs on doors; SFD not closing on third floor west; doors not latching in rated assemblies; emergency lights not on corridor lighting circuits; need hazardous chem sign on pool door; see fire alarm permit for fire alarm items; 8/27/2003 3:44:41 PM
|
INSP-Final Inspection | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2003 | 8/18/2003 | 8/18/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/17/2003 at 10:06:30 PM. Contact: ###-####. hydro on wet system okay 8/18/2003 11:02:03 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 10:07:03 AM. Contact: ###-####. hydro on wet system dropped 4 psi 8/15/2003 2:28:31 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2003 | 6/23/2003 | 6/23/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/23/2003 at 4:54:31 AM. Contact: ###-####. porte cachere from riser to canopy hydro okay 6/23/2003 1:48:23 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/17/2003 at 6:09:36 PM. Contact: ###-####. okay to cover hard lid areas on 2nd floor corridor; okay on hydro for first floor - will need to test when heads are installed 6/18/2003 10:36:04 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/20/2003 at 3:44:29 PM. Contact: ###-####. hydro okay for 2-3 floor rooms omly; corridor not completed 5/21/2003 3:51:51 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/19/2003 | 5/19/2003 | 5/19/2003 | A | PART |
Rick Jackson
|
|
|
hydro on dry system okay; will need detail for hangers on TJI's for the six inch main
|