(Comfort Suites) * To install complete above ground NFPA 13, fire protection systems in a new, 51,500-ft/2, three-story, 83 rooms hotel, with conference room, covered Porte Cochere. The underground fire service supply and remote Fire Department Connection are permitted separately under FIR03-2271. This building is fully fire sprinklered for area increase. The fire sprinkler work shall comply with installation requirements of NFPA 13-1999 as required per the Uniform Fire Code, attached review comment and conditions list; as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-02863.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/26/20038/27/20038/27/2003AFAIL
DetailsRick Jackson
julio; Phone #: ###-#### Internet Inspection Request from: Marc Lileks fire sprinkler control signs on doors; SFD not closing on third floor west; doors not latching in rated assemblies; emergency lights not on corridor lighting circuits; need hazardous chem sign on pool door; see fire alarm permit for fire alarm items; 8/27/2003 3:44:41 PM
INSP-Final Inspection8/27/20038/27/20038/27/2003PPASS
DetailsRick Jackson
INSP-Sprinkler Rough-in/Hydro8/17/20038/18/20038/18/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/17/2003 at 10:06:30 PM. Contact: ###-####. hydro on wet system okay 8/18/2003 11:02:03 AM
INSP-Sprinkler Rough-in/Hydro8/15/20038/15/20038/15/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/15/2003 at 10:07:03 AM. Contact: ###-####. hydro on wet system dropped 4 psi 8/15/2003 2:28:31 PM
INSP-Sprinkler Rough-in/Hydro6/23/20036/23/20036/23/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/23/2003 at 4:54:31 AM. Contact: ###-####. porte cachere from riser to canopy hydro okay 6/23/2003 1:48:23 PM
INSP-Sprinkler Rough-in/Hydro6/17/20036/18/20036/18/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/17/2003 at 6:09:36 PM. Contact: ###-####. okay to cover hard lid areas on 2nd floor corridor; okay on hydro for first floor - will need to test when heads are installed 6/18/2003 10:36:04 AM
INSP-Sprinkler Rough-in/Hydro5/20/20035/21/20035/21/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/20/2003 at 3:44:29 PM. Contact: ###-####. hydro okay for 2-3 floor rooms omly; corridor not completed 5/21/2003 3:51:51 PM
INSP-Sprinkler Rough-in/Hydro5/19/20035/19/20035/19/2003APART
DetailsRick Jackson
hydro on dry system okay; will need detail for hangers on TJI's for the six inch main