FIR-Aging Inspection | 7/4/2005 | 7/4/2005 | 7/7/2005 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 7/7/2005 | 7/7/2005 | 7/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/27/2003 | 8/28/2003 | 8/28/2003 | A | FAIL |
Troy Cobbley
|
|
|
replace bent sprinkler pendants, replace painted sprinkler pendants, remove tape from pendants, provide rated access panel for inspectors test valve 8/28/2003 3:59:52 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | FAIL |
Troy Cobbley
|
|
|
hydro test failed due to leaking fitting on the wet system 6/23/2003 3:31:45 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2003 | 6/23/2003 | 6/23/2003 | A | PART |
Troy Cobbley
|
|
|
started the 24 hour air test on the dry system. Started at 11:00am with 44 lbs
|
INSP-Sprinkler Rough-in | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | FAIL |
Troy Cobbley
|
|
|
###-#### john No approved plans on site. No inspection done 5/23/2003 3:39:43 PM
|
INSP-Sprinkler Rough-in | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | FAIL |
Troy Cobbley
|
|
|
Provide insulation on cpvc piping at north end of building 5/9/2003 4:22:20 PM
|