INSP-Final Inspection | 4/20/2004 | 4/20/2004 | 4/20/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm finaled on 1/8/2004 under FIR03-00658
|
INSP-Final Inspection | 11/10/2003 | 11/10/2003 | 11/10/2003 | A | PART |
Troy Cobbley
|
|
|
Temp occupancy given until the fire alarm system has been approved, installed and tested per Dave Millers permission
|
INSP-Sprinkler Rough-in/Hydro | 10/30/2003 | 10/31/2003 | 10/31/2003 | A | PASS |
Troy Cobbley
|
|
|
wet system hydro test is ok 10/31/2003 1:49:46 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | PART |
Troy Cobbley
|
|
|
rough-in items from the first two inspections have been taken care of. Items at the riser still need to be completed. Hydro test failed. 10/24/2003 1:02:37 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2003 | 10/7/2003 | 10/7/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/6/2003 at 1:41:13 PM. Contact: ###-####. okay to cover 2nd floor only except room 209 as it has protective cover on head; the branch line on the north side of the new addition is not installed; the new wet part of the riser is not complete; canopies not installed on all 401 heads; will need spare heads in head box; branch line on east side not complete; this building will now have over 20 heads and will require monitoring and does not have complete sprinkler coverage 10/7/2003 3:24:35 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2003 | 10/2/2003 | 10/2/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 2:01:10 PM. area on first floor okay to cover except by the NE area by stair as SSU and SSP are too close together - reinspection needed to cover this area; sidewall installed under stair instead of pendant as shown on plans 10/2/2003 9:52:07 AM
|