Permit Number | FIR03-00433 |
Status | Finaled |
Name |
MICRON TECHNOLOGY INC
|
Site Address |
8000 S FEDERAL WAY
|
Project Name | SPR Micron Building #24E |
Customer Number | PCS# 24-20035870 |
ePlanReview | |
Description |
Micron Building #24E - To add and modify the existing fire sprinkler system for the relocation of 24YE to Building #24E Basement Room #003A, to convert the 2,200-ft/2 Storage Room #003A to a FAB 4 Yield Analysis Lab. This work is being done in the basement of Building #24E between grid lines 32&33 and C.2&E.5. Fire sprinkler work is related to the installation of a partition, suspended ceilings, and some mechanical and electrical. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-01706.
|