INSP-Sprinkler Rough-in/Hydro | 8/23/2004 | 8/24/2004 | 8/24/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/23/2004 at 2:52:13 PM. Contact: ###-####. Storage room completed to meet OH with minor changes made to head layout to reflect correct branch line layout that is different than shown on plans 8/24/2004 10:28:08 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2004 | 8/18/2004 | 8/18/2004 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 8/17/2004 at 11:42:05 AM. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2004 | 4/21/2004 | 4/21/2004 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/21/2004 at 10:40:03 AM. Contact: ###-####. Okay to cover; this is a phased project and the current waiting room has two heads and will be overspaced when it is changed to storage room (shown with three heads on plans for OH); minor changes made due to mechanical duct work 4/21/2004 2:06:59 PM
|
FIR-Aging Inspection | 12/8/2003 | 12/8/2003 | 12/8/2003 | | PASS |
Rick Jackson
|
|
|
this project is still ongoing 12/8/2003 12:54:54 PM
|