INSP-Final Inspection | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | PASS |
Troy Cobbley
|
|
|
Bruce --- shell and core, please call first for access.; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
INSP-Sprinkler Rough-in/Hydro | 12/4/2003 | 12/4/2003 | 12/4/2003 | P | PART |
Rick Jackson
|
|
|
bruce -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie overhead hydro okay; will additional hangers in video store area; will need to inspect the rest of the building 12/4/2003 5:11:37 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/2/2003 | 12/2/2003 | 12/2/2003 | A | FAIL |
Troy Cobbley
|
|
|
two heads of of 1" outlet in address 8170, 8172 and 8176. No pendant in restroom and upright overspaced near restroom in address 8174. Upright overspaced along east wall in address 8184. Plans show 1 1/4" branchlines and 2" far main. 1 1/2" branchlines and 3" far main is installed. Calcs show Dyna Flow pipe but Sch. 40 is installed. Resubmit plans with everything corrected. No other items inspected. Underground flush failed. Hydro test failed on the overhead system. Hydro test passed on canopy system
|
INSP-Sprinkler Rough-in | 11/12/2003 | 11/12/2003 | 11/12/2003 | A | PART |
Rick Jackson
|
|
|
okay to cover canopy; 200 degree heads installed for this cavity
|