Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR03-00598
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4750 S SURPRISE WAY
Project NameSPR EASTWIND COMMUNITY CHURCH
Customer Number 
ePlanReview 
Description
Eastwind Community Church - To install a new, wet, light hazard system with a new 10,991-ft/2, one story, type V-B, church building which has a 478-ft/2 basement mechanical room. Fire sprinklers are used for area increase. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground system supply main was installed under FIR03-00346. This permit is attached to building permit: BLD03-00370.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/18/20046/18/20046/18/2004APASS
DetailsRick Jackson
INSP-Final Inspection6/17/20046/17/20046/17/2004PFAIL
DetailsRick Jackson
Need address; knox box; EL's not charged; need lock out on bell breaker; extinguishers 6/17/2004 5:11:24 PM
INSP-Sprinkler Rough-in/Hydro5/24/20045/24/20045/24/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/24/2004 at 10:24:34 AM. Contact: ###-####. Hydro on overhead and FDC okay 5/24/2004 2:31:19 PM
INSP-Sprinkler Rough-in4/21/20044/21/20044/21/2004PNR
DetailsRick Jackson
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Received call from Jeff and all of the heads aren't installed in the canopy 4/21/2004 1:29:56 PM
INSP-Sprinkler Rough-in4/21/20044/21/20044/21/2004PPART
DetailsRick Jackson
Met with Jeff of TVFP and per Dave Miller the dry sidewalls in the front canopy have been approved with two additional heads; okay to cover the interior walls at piping to canopy 4/21/2004 2:33:03 PM
INSP-Sprinkler Rough-in/Hydro2/17/20042/18/20042/18/2004AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 2/17/2004 at 1:07:04 PM. Contact: ###-####. okay to cover hard lid areas; concealed combustible space around fireplace will require sprinklers; EQ at riser not completed; as-builts needed for minor changes; front canopy not sprinklered per plans as the construction of the canopy has changed - sidewall heads won't meet listing for smooth ceiling 2/18/2004 3:49:27 PM
INSP-Sprinkler Rough-in/Hydro2/2/20042/3/20042/3/2004APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 2/2/2004 at 9:14:05 AM. resubmittals needed for changes to dry sidewalls that will be deleted as the rear canopy is not installed and the main lobby canopy has changed to open beams and sidewalls won't work; there are changes to several areas of the 4 inch main (all EQ's not completed) to get around duct, etc; changes made on branch lines due to added closets; heads added under stairs in basement; the main auditorium lines are not installed; okay to cover hard lid areas; head legend shows all uprights in concealed spaces with pendants used in some areas; riser not completed 2/3/2004 2:01:56 PM
FIR-Aging Inspection1/12/20041/12/20041/12/2004 PASS
DetailsRick Jackson
project is still in progress 1/12/2004 7:08:42 AM