INSP-Final Inspection | 6/18/2004 | 6/18/2004 | 6/18/2004 | A | PASS |
Rick Jackson
|
|
|
|
INSP-Final Inspection | 6/17/2004 | 6/17/2004 | 6/17/2004 | P | FAIL |
Rick Jackson
|
|
|
Need address; knox box; EL's not charged; need lock out on bell breaker; extinguishers 6/17/2004 5:11:24 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2004 | 5/24/2004 | 5/24/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/24/2004 at 10:24:34 AM. Contact: ###-####. Hydro on overhead and FDC okay 5/24/2004 2:31:19 PM
|
INSP-Sprinkler Rough-in | 4/21/2004 | 4/21/2004 | 4/21/2004 | P | NR |
Rick Jackson
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Received call from Jeff and all of the heads aren't installed in the canopy 4/21/2004 1:29:56 PM
|
INSP-Sprinkler Rough-in | 4/21/2004 | 4/21/2004 | 4/21/2004 | P | PART |
Rick Jackson
|
|
|
Met with Jeff of TVFP and per Dave Miller the dry sidewalls in the front canopy have been approved with two additional heads; okay to cover the interior walls at piping to canopy 4/21/2004 2:33:03 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/17/2004 at 1:07:04 PM. Contact: ###-####. okay to cover hard lid areas; concealed combustible space around fireplace will require sprinklers; EQ at riser not completed; as-builts needed for minor changes; front canopy not sprinklered per plans as the construction of the canopy has changed - sidewall heads won't meet listing for smooth ceiling 2/18/2004 3:49:27 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/2/2004 | 2/3/2004 | 2/3/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 9:14:05 AM. resubmittals needed for changes to dry sidewalls that will be deleted as the rear canopy is not installed and the main lobby canopy has changed to open beams and sidewalls won't work; there are changes to several areas of the 4 inch main (all EQ's not completed) to get around duct, etc; changes made on branch lines due to added closets; heads added under stairs in basement; the main auditorium lines are not installed; okay to cover hard lid areas; head legend shows all uprights in concealed spaces with pendants used in some areas; riser not completed 2/3/2004 2:01:56 PM
|
FIR-Aging Inspection | 1/12/2004 | 1/12/2004 | 1/12/2004 | | PASS |
Rick Jackson
|
|
|
project is still in progress 1/12/2004 7:08:42 AM
|