INSP-Final Inspection | 3/3/2004 | 3/3/2004 | 3/3/2004 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2004 | 3/2/2004 | 3/2/2004 | A | PASS |
Rick Jackson
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes overhead hydro okay; need to test tampers/flows etc. 3/2/2004 1:14:35 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | FAIL |
Rick Jackson
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes hydro failed; will reschedule 3/1/2004 4:45:53 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | PART |
Rick Jackson
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore UG flush only for the relocated building sprinkler system - okay; attempted to forward flow the BFP through the 2 inch drain and the pitot reading was 10 psi - needed 12 psi to obtain the required flow 2/24/2004 10:06:41 AM
|
INSP-Sprinkler Rough-in | 1/8/2004 | 1/9/2004 | 1/9/2004 | A | PART |
Rick Jackson
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie soffiit areas okay to cover; minor modifications made under stairs 1/9/2004 10:52:54 AM
|
INSP-Sprinkler Rough-in/Hydro | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | PART |
Rick Jackson
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes peak and northside lower area tented okay; electrical work still in progress on the south lower side - not tented yet 12/22/2003 3:18:08 PM
|
INSP-Sprinkler Rough-in | 12/19/2003 | 12/19/2003 | 12/19/2003 | P | PART |
Rick Jackson
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes r/i for the branch lines at the peak and at the two lower levels on the first floor; will need to verify tenting prior to cover and insulation 12/19/2003 2:57:45 PM
|