INSP-Final Inspection | 5/20/2004 | 5/21/2004 | 5/21/2004 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection 5/21/2004 10:41:11 AM
|
INSP-Final Inspection | 5/21/2004 | 5/21/2004 | 5/21/2004 | A | PASS |
Troy Cobbley
|
|
|
FIRE SPRINKLERS FINALED
|
INSP-Final Inspection | 5/18/2004 | 5/19/2004 | 5/19/2004 | P | FAIL |
Troy Cobbley
|
|
|
Remove handles on the valves, provide nfpa 25, provide head wrench and provide tag on riser 5/19/2004 1:53:55 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/20/2004 | 1/20/2004 | 1/20/2004 | P | PART |
Troy Cobbley
|
|
|
the remaining sprinkler piping is OK to cover 1/20/2004 2:40:09 PM
|
INSP-Sprinkler Rough-in | 1/16/2004 | 1/16/2004 | 1/16/2004 | P | FAIL |
Troy Cobbley
|
|
|
see approved sprinkler plans for locations where the insulation for the tenting of the sprinkler piping is not secured 1/16/2004 3:01:02 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/29/2003 | 12/30/2003 | 12/30/2003 | P | NR |
Troy Cobbley
|
|
|
inspection was just for a initial look at what is being installed. The contractor still needs to resubmit plans and all of the tenting of the sprinkler piping had not been done 12/30/2003 2:20:07 PM
|