Permit Information
Permit NumberFIR03-00779
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 601 N PHILLIPPI ST
Project NameSPR STEIN DISTRIBUTING
Customer Number 
ePlanReview 
Description
(STEIN DISTRIBUTING CO., INC.) To fulfill letter agreement on file to fire sprinkler the entire building, for the allowance for non separation of the offices to the warehouse area and allow for certificate of occupancy and completion in the building permit this permit is attached. Work scope entails extending the wet into all heated areas and extending an existing dry system and adding a new dry system. Also includes the relocation of the existing compressor to the new dry system and installing a new compressor to the existing system (for the added system capacity). The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-00657.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/26/20047/26/20047/26/2004PPASS
DetailsTroy Cobbley
Fire sprinklers finaled
INSP-Sprinkler Rough-in/Hydro7/22/20047/22/20047/22/2004PPART
DetailsTroy Cobbley
Forward flush of the backflow preventer and the additional head in the closet are ok. Still need alarm connections and hanger from previous correction notice to be done. 7/22/2004 1:58:54 PM
INSP-Sprinkler Rough-in/Hydro7/20/20047/21/20047/21/2004APASS
DetailsTroy Cobbley
Hydro test for the wet system passed. Provide forward flush of the backflow preventor per review note #9. Provide signage. Provide alarm interconnections between FACP and new dry pipe riser. Provide head in closet and provide hanger per previous correction notice. 7/21/2004 2:25:31 PM
INSP-Sprinkler Rough-in/Hydro7/16/20047/16/20047/16/2004PPASS
DetailsTroy Cobbley
24 hour test of the existing dry system is ok 7/16/2004 4:06:06 PM
INSP-Sprinkler Rough-in/Hydro7/14/20047/15/20047/15/2004APART
DetailsTroy Cobbley
Hydro tests for both dry systems are ok. 24 hour test on the second dry system started at 12:45 at 67psi 7/15/2004 12:44:05 PM
INSP-Sprinkler Rough-in/Hydro7/12/20047/13/20047/13/2004APART
DetailsTroy Cobbley
24 hour air test on the new dry system is ok. Rough-in inspection on the remaining first floor offices is ok except for one additional head and one hanger that need to be added. See plans for location. 7/13/2004 9:45:57 AM
INSP-Sprinkler Rough-in/Hydro7/12/20047/13/20047/13/2004APART
DetailsTroy Cobbley
24 hour air test on the new dry system is ok. Rough-in inspection on the remaining first floor offices is ok except for one additional head and one hanger that need to be added. See plans for location. 7/13/2004 9:45:57 AM
INSP-Sprinkler Rough-in7/9/20047/12/20047/12/2004APART
DetailsTroy Cobbley
24 hour air test started at 9:00am with 47 1/2 psi 7/12/2004 9:41:27 AM
INSP-Sprinkler Rough-in6/18/20046/21/20046/21/2004APART
DetailsTroy Cobbley
Sprinkler rough-in for first and second floor east side offices OK. See approved plans for specific locations. 6/21/2004 10:09:27 AM
INSP-Sprinkler Rough-in6/1/20046/2/20046/2/2004APART
DetailsRick Jackson
Contact: Chris; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley See approved plans for areas inspected - highlighted areas only 6/2/2004 11:29:20 AM
FIR-Aging Inspection3/30/20043/30/20043/30/2004 NR
DetailsTroy Cobbley
Per Randy with Debest Fire work is in progress 3/30/2004 3:35:26 PM