INSP-Final Inspection | 6/29/2004 | 6/29/2004 | 6/29/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled
|
INSP-Sprinkler Rough-in | 3/12/2004 | 3/15/2004 | 3/15/2004 | A | PASS |
Troy Cobbley
|
|
|
Main rough-in ok 3/15/2004 10:08:31 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/11/2004 | 3/12/2004 | 3/12/2004 | A | PASS |
Troy Cobbley
|
|
|
hydro test on the dry pipe riser is OK 3/12/2004 11:20:23 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/10/2004 | 3/11/2004 | 3/11/2004 | P | PART |
Troy Cobbley
|
|
|
24 hour air test is ok 3/11/2004 4:30:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/9/2004 | 3/10/2004 | 3/10/2004 | P | PART |
Troy Cobbley
|
|
|
Inspection was for the start of the 24 hour air test. Piping in the attic is at 49psi and the riser is at 46psi 3/10/2004 3:04:56 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/8/2004 | 3/9/2004 | 3/9/2004 | P | PART |
Troy Cobbley
|
|
|
wet and dry system hydro test are ok 3/9/2004 4:06:43 PM
|
INSP-Final Inspection | 2/12/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy was given until all of the fire mains are upgraded per plans submitted to boise city and the fire alarm system is completed
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/27/2004 at 1:33:26 PM. Contact: ###-####. okay to cover wet system in office area - the 2.5 inch is not completed at the tie-in to the exsisting main; the dry system is installed in the attic area but the 4 inch main is not completed where it passes through the roof to tie it into the new riser (see plans) 1/28/2004 10:46:40 AM
|