INSP-Supply line flush | 4/22/2004 | 4/23/2004 | 4/23/2004 | A | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled 4/23/2004 9:15:06 AM
|
INSP-Final Inspection | 4/22/2004 | 4/22/2004 | 4/22/2004 | P | CANC |
Troy Cobbley
|
|
|
Inspection rescheduled for 4/23/04 with plumber 4/22/2004 3:23:30 PM
|
INSP-Final Inspection | 4/22/2004 | 4/22/2004 | 4/22/2004 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection 4/22/2004 2:14:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of flush, provide city approved plans for final inspection 4/22/2004 10:09:43 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | PASS |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover 2/24/2004 8:45:05 AM
|
INSP-Sprinkler Rough-in | 2/19/2004 | 2/19/2004 | 2/19/2004 | P | PART |
Troy Cobbley
|
|
|
Phoned bill alexander about status of permit and supposed conversation with the contrator. Bill stated that the contrator could cover piping that matched the original approved plan. I found three rooms that piping does match print. I marked these rooms on the on site approved plans. I placed re-inspection fees for the next inspection due to next inspection being the third time for the same issue (trying to get a cover inspection with out approved plans) 2/19/2004 12:33:42 PM
|
INSP-Sprinkler Rough-in | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | PART |
Troy Cobbley
|
|
|
sprinkler piping roughin ok based on resubmitted plans on site. The sprinkler rough-in approval is based on the resubmitted plans being approved and matching installation. 2/18/2004 4:17:34 PM
|