Permit Information
Permit NumberFIR04-00125
StatusFinaled
Name FIRE SENTRY SYSTEMS
Site Address 800 E PARK BLVD
Project Namealm MK PLAZA IV-6TH & 7TH FLRS
Customer Number 
ePlanReview 
Description
Per the upgrade agreement dated 5/5/2000, a floor a year is to be upgraded to the new Silent Knight FACP. There is a TI on the entire 6th and part of the 7th floors. These areas will be upgraded per the agreement. Sprinkler monitoring, elevator recall/shutdown, door release, manual pull stations, HVAC shutdown and requirements for a high rise building (notification throughout, speaker/strobes).

The associated building permit (BLD 03-02287) is to remodel 32,531 sq.ft. of office on the 6th floor and 4,177 sq.ft. of office on the 7th floor per approved plans. Work includes selective demolition of interior non-bearing walls; construction of new non-combustible, fire-resistive walls to create offices & support areas; installation of suspended ceiling grid system; upgrade of electrical, mechanical, plumbing, fire suppression & alarm systems and security devices. All per approved plans to include notes and all attached plan review comments and conditions of all reviewing agencies. PC03-577/drs (U.S. ATTORNEY'S OFFICE)(MK PLAZA IV-6TH & 7TH FLRS)

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/14/20045/14/20045/14/2004PPASS
DetailsRick Jackson
The 5895 power panel was not used nor required; as builts to be provided to owner 5/14/2004 4:41:30 PM
INSP-Final Inspection5/13/20045/13/20045/13/2004PFAIL
DetailsRick Jackson
earl; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need updated maps; lobby doors on 6th floor with mag hold opens don't work properly - need extensions; 5/14/2004 7:36:21 AM
INSP-Alarm Testing5/12/20045/12/20045/12/2004PFAIL
DetailsRick Jackson
earl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore old NAC devices not working and devices on 7th floor not working; candela on strobes not per plans; zone 4 on 6th floor not working; verify all candelas; test flows and all new devices 5/13/2004 7:29:44 AM