INSP-Final Inspection | 4/22/2004 | 4/23/2004 | 4/23/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 4/23/2004 10:21:43 AM
|
INSP-Final Inspection | 4/21/2004 | 4/21/2004 | 4/21/2004 | P | FAIL |
Troy Cobbley
|
|
|
mount map, shut down all hvac units upon activation of a duct smoke detector, monitoring company did not receive all of the signals and what they did receive was not right, (all devices need retested), verify a/v locations, mount knox box and provide signage on riser room door. Get nfpa 72 forms 4/21/2004 4:34:05 PM
|
INSP-Conference | 4/1/2004 | 4/2/2004 | 4/2/2004 | A | DONE |
Troy Cobbley
|
|
|
contractor wanted to discuss location of smoke detector over the facp and strobe locations 4/2/2004 1:00:34 PM
|
INSP-Conference | 3/8/2004 | 3/8/2004 | 3/8/2004 | A | DONE |
Troy Cobbley
|
|
|
I stopped at the job site and posted a stop work order against the fire alarm system. The fire alarm panel and conduit have been installed by Idaho Electric. The installers name is Neil Lake. I spoke to Brad, who is the owner of Idaho Electric, about not installing without approved plans. I also spoke to Patrick with system services who actually submitted the plans.
|
INSP-Conference | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | DONE |
Troy Cobbley
|
|
|
I stopped at the project to do an underground inspection and saw the fire alarm panel mounted in the entry lobby of the building. I sent an e-mail to Mary
|
INSP-Conference | 3/5/2004 | 3/5/2004 | 3/5/2004 | P | DONE |
Troy Cobbley
|
|
|
I stopped at the project to do an underground inspection and saw the fire alarm panel mounted in the entry lobby of the building. I sent an e-mail to Mary
|