Permit Information
Permit NumberFIR04-00161
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 3033 W ELDER ST
Project NameSPR WELLS FARGO
Customer Number 
ePlanReview 
Description
(WELLS FARGO SERVICE CENTER)(MECHANICAL UPGRADE) BUILDING #1 - To install a new auxiliary Pre-Action fire suppression system in the Data (Computer) Room/s and above its combustible cavity ceilings previously protected with Halon suppression agent systems. The underfloor combustible areas will be protected with an extended existing wet system. This building is fully fire sprinklered for area increase. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-03054.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/1/20056/7/20056/7/2005PPASS
DetailsForrest France
Fire sprinkler finaled.
INSP-Final Inspection5/25/20055/31/20055/27/2005PCANC
DetailsTroy Cobbley
kerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Inspection cancelled from web by: Marsha Smylie
INSP-Final Inspection5/13/20055/16/20055/16/2005PFAIL
DetailsForrest France
Two upright heads in vault are spaced too far off wall to meet OH 1 requirements for this space. Provide map at riser indicating location of auxillary drains. Provide test certificates. Verify foreward flow through BFP as required by note #59. Provide sp
INSP-Sprinkler Rough-in/Hydro2/2/20052/2/20052/2/2005APART
DetailsRick Jackson
Air test okay; need to add EQ at new main; different heads used in underfloor area; need as-builts for addition to under floor in phone room 2/2/2005 9:45:34 AM
INSP-Sprinkler Rough-in/Hydro1/31/20052/1/20052/1/2005APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 1/31/2005 at 6:43:05 PM. Contact: ###-####. Start air test at 43 psi 2/1/2005 11:17:05 AM
INSP-Sprinkler Rough-in/Hydro1/28/20051/31/20051/31/2005PPART
DetailsRick Jackson
Mick; Phone #: ###-#### Internet Inspection Request from: Jan Rice hydro okay 1/31/2005 4:03:52 PM
FIR-Aging Inspection12/27/200412/27/200412/28/2004 PASS
DetailsRick Jackson
Talked to Roger and the work is in process and the final should be called in very soon 12/28/2004 9:30:19 AM