Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR04-00258
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 9465 W EMERALD
Project NameSPR VIDEO EYE CORP
Customer Number 
ePlanReview 
Description
Video Eye Corporation (Shell & Core) - To install the overhead fire protection system in a new 37,750 ft/2, two story, concrete tilt-up office/warehouse shell and core building. The overhead system is basically designed for a shell with core work for stairways, elevator and second floor restrooms and corridor. This permit plan review is for a shell and core permit only. Separate tenant improvement permits will be required to finish this building for occupancy. This building will be fully fire sprinklered. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-00300.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/12/20057/13/20057/13/2005PPASS
DetailsTroy Cobbley
Fire sprinkler permit finaled
INSP-Final Inspection7/7/20057/8/20057/8/2005PCANC
DetailsTroy Cobbley
COCNTACT JIM; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro6/28/20056/30/20056/30/2005APASS
DetailsTroy Cobbley
Above ground hydro test and underground flush passed.
INSP-Sprinkler Rough-in/Hydro6/27/20056/27/20056/27/2005PFAIL
DetailsForrest France
AG hydrostatic test failed, three leaks were found. Rough-in is satisfactory.
INSP-Sprinkler Rough-in/Hydro6/21/20056/24/20056/24/2005ACANC
DetailsForrest France
Cancel inspection per Jim Danes with De Best fire, they will re-schedule for next week.
INSP-Sprinkler Rough-in6/20/20056/21/20056/21/2005AFAIL
DetailsForrest France
Heads in four areas as marked on approved plans are blocked and need repositioning, Provide flexible coupling at riser before floor penetration.
INSP-Sprinkler Rough-in5/4/20055/4/20055/4/2005PPART
DetailsTroy Cobbley
Based on the plan modifications the south stairway second floor two sprinkler heads and the two at the bottom of the stairs are ok to cover
INSP-Sprinkler Rough-in/Hydro3/24/20053/24/20053/24/2005PPASS
DetailsTroy Cobbley
Phone #: ###-#### Skylights ok to cover in south center and northeast areas. See approved plans for exact lacation. 3/24/2005 12:42:45 PM
INSP-Sprinkler Rough-in/Hydro2/10/20052/11/20052/11/2005ACANC
DetailsTroy Cobbley
contact: Steve; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro2/10/20052/10/20052/10/2005PCANC
DetailsTroy Cobbley
contact: Steve - cover inspection late PM if possible; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
FIR-Aging Inspection11/22/200411/22/200411/22/2004 PART
DetailsRick Jackson
Building is still under construction 11/22/2004 11:23:33 AM