INSP-Final Inspection | 9/23/2004 | 9/23/2004 | 9/23/2004 | P | PASS |
Troy Cobbley
|
|
|
fire sprinkler finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/26/2004 | 8/27/2004 | 8/27/2004 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test passed 8/27/2004 2:04:10 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/25/2004 | 8/26/2004 | 8/26/2004 | A | PASS |
Troy Cobbley
|
|
|
200 lbs hydro test has passed. Started the 24 hour air test at 3:00 with 48psi on the gauge 8/26/2004 3:21:26 PM
|
INSP-Sprinkler Rough-in | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Contractor does not have the dry pendants yet. Temporary pendants installed for now. Eric and I spoke about modifications to the connection between the new system and the old. I verified with Bill this minor modification would not require submittals. 8/25/2004 11:23:46 AM
|
INSP-Sprinkler Rough-in | 7/15/2004 | 7/15/2004 | 7/15/2004 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping above the hard lid areas are ok for cover. I also looked at the main and branchline sizing, hangers and earthquake bracing. They are ok as well. Sprig ups, drops and return bends have not been inspected since not all work is complete. 7/15/2004 2:33:21 PM
|