INSP-Final Inspection | 9/16/2004 | 9/16/2004 | 9/16/2004 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2004 | 8/16/2004 | 8/16/2004 | A | PASS |
Troy Cobbley
|
|
|
Second floor sprinkler piping is ok to cover. Second floor hydro test passed. 8/16/2004 3:36:15 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2004 | 8/4/2004 | 8/4/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 9:19:09 AM. Requirements of 4 or less heads on one inch and no more than 6 from the 1.25 inch is met; okay to cover third floor only 8/4/2004 2:35:41 PM
|
INSP-Conference | 8/3/2004 | 8/3/2004 | 8/3/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/3/2004 at 8:12:23 AM. Hydro test on OH system okay; may be required to this again depending on calc's for this floor 8/3/2004 2:52:38 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/30/2004 | 8/2/2004 | 8/2/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 3:21:42 PM. Third floor - as many as 4 heads off one inch in two areas; many areas with three heads and nearly all with two heads off one inch; provide calc's for verification or separation per note #8 in plan review 8/2/2004 2:24:01 PM
|