Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00548
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 12754 W LASALLE ST
Project NameSPR UG LASALLE BOISE RESEARCH
Customer Number 
ePlanReview 
Description
LaSalle Boise Research Center (Shell Office Building) - To install a single, dedicated fire service supply main for a new 16,940-ft/2, one story, concrete tilt-up office shell building. This service will tap in LaSalle St. where the contractor will start at the property line and run approximately 74' with 6" DR-14 C-900 PVC, turn 90º west approximately 105' to another 90º, turn north and run approximately 97', then another 90º east approximately 25' under the building footing and up through the finish floor with Class 50 Ductile Iron to a M.J. Adapter. This is an underground permit only. Separate overhead system t permit will be required. This building will be fully fire sprinklered. The sprinklers will be used for area increase. This fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-00958.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIR-Aging Inspection3/17/20103/17/20103/17/2010 PASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection3/17/20103/17/20103/17/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/19/20051/19/20051/19/2005PCANC
DetailsTroy Cobbley
Could not locate the overhead permit via company permits. This is to verify new plans and final the sprinkler. OH and UG. Internet Inspection Request from: Trent Bice
INSP-Sprinkler Rough-in/Hydro10/20/200410/21/200410/21/2004APASS
DetailsTroy Cobbley
Underground supply hydro test passed 10/21/2004 12:15:53 PM
INSP-Sprinkler Rough-in/Hydro10/6/200410/7/200410/7/2004ACANC
DetailsTroy Cobbley
Rescheduled for this afternoon 10/7/2004 9:05:28 AM
INSP-Sprinkler Rough-in/Hydro10/7/200410/7/200410/7/2004PPASS
DetailsTroy Cobbley
Underground supply piping is ok to cover 10/7/2004 4:26:42 PM
INSP-Sprinkler Rough-in/Hydro10/6/200410/6/200410/6/2004PCANC
DetailsTroy Cobbley
Jonathan is our foreman on site. Please call prior to arrival. We need this to be the last inspection of the day. We may not be ready till morning. So please call Jonathan before arriving. Thank you.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
INSP-Sprinkler Rough-in/Hydro10/6/200410/6/200410/6/2004PCANC
DetailsTroy Cobbley
Contractor is not ready 10/6/2004 4:02:38 PM