INSP-Final Inspection | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PASS |
Rick Jackson
|
|
|
Rick, We spoke to the Hoff Building Maintenance man Kevin. He would like to test at 10:00am tomorrow if at all possible. He will notify everyone in the building tonight, so that they may plan ahead. If there is a problem with that time, please let me know as soon as possible, so that we may let the building occupants know when to expect a test. My cell number is ###-#### if you cannot reach me at the office. Thank you for your time. Jason; Phone #: ###-#### Internet Inspection Request from: Jason Minnick
|
INSP-Final Inspection | 1/17/2005 | 1/18/2005 | 1/18/2005 | P | FAIL |
Rick Jackson
|
|
|
Rick, We would like to have you come out and check off the violations from your prior inspection. Wendy at the Hoff Building is off on vacation, but asked if we could request that you bring Dave Hanna along as well to sign off on their structural as well. Please call me at the office (###-####), or on my cell (###-####) when you know when would be a good time. Thank you for your time. jason; Phone #: ###-#### Internet Inspection Request from: Jason Minnick All other tiems completed except the volume of the voice page is barely audible 1/18/2005 2:19:26 PM
|
INSP-Final Inspection | 11/22/2004 | 11/29/2004 | 11/29/2004 | A | FAIL |
Rick Jackson
|
|
|
Rick, We would like to request meeting at the Hoff building at 9:00am if possible. Please advise us if there is a better time for you. You can reach me here at the office, or on my cell phone at ###-#### as needed. Thank you. Jason; Phone #: ###-#### Internet Inspection Request from: Jason Minnick FACP panel displat not operating; voice page does not tell occupants to exit but to wait at corridors; initiating devices don't match plan addresses; all page microphone not working; BPS one-line diagrams don't match actual wiring; need updated maps 11/29/2004 11:41:38 AM
|