INSP-Final Inspection | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 7/25/2005 | 7/26/2005 | 7/26/2005 | A | PART |
Forrest France
|
|
|
One escutcheon is missing on a dry pendent at front porch, tape needs to be removed from escutcheons on heads at east side of porch.
|
INSP-Supply line flush | 6/3/2005 | 6/8/2005 | 6/8/2005 | A | PASS |
Troy Cobbley
|
|
|
Forward flow test for the backflow preventer passed, head wrench, sign on bell and map have been supplied. Need backflow certification, canopies and tags on riser.
|
INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | PART |
Forrest France
|
|
|
Alarms and riser functionality tested. Final pending head wrench, tags, foreward flow test, bell sign, canopies, drain map, and backflow certification.
|
INSP-Sprinkler Rough-in/Hydro | 5/11/2005 | 5/11/2005 | 5/11/2005 | A | PART |
Forrest France
|
|
|
24 hour air test of preaction system passed within allowable 1 1/2 psi. loss. Preaction system valve appears to be installed as a single interlock, not double interlock as indicated on plan submittals.
|
INSP-Sprinkler Rough-in/Hydro | 5/9/2005 | 5/10/2005 | 5/10/2005 | A | PART |
Forrest France
|
|
|
Begin 24 hour air test of preaction system at 9:00 am on 5/10/05.
|
INSP-Sprinkler Rough-in/Hydro | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | PASS |
Troy Cobbley
|
|
|
Hydro test for the underground passed. Done by Bill Alexander. 3/10/2005 3:42:56 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | PASS |
Troy Cobbley
|
|
|
kerry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
2" main running east to west, top floor, south bedroom, 2 X 11/2" X 1, shop thread tee leaked, will be repaired. East attic upright, in the top floor north bedroom is obstructed and needs corrected. Other grooved coupling (3 or 4) leaking appeared to stop after field adjustments. JWA
|
INSP-Supply line flush | 3/3/2005 | 3/4/2005 | 3/4/2005 | A | PASS |
Troy Cobbley
|
|
|
Underground supply flushed from the tap at the street to the first post indicating valve and then through the museum. 3/4/2005 2:29:48 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/19/2005 at 10:22:06 AM. Contact: ###-####. Air test on preaction failed; air test on dry okay 1/20/2005 9:32:16 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/18/2005 | 1/19/2005 | 1/19/2005 | A | PART |
Rick Jackson
|
|
|
Kerry-call before you go out; Phone #: ###-#### Internet Inspection Request from: Jan Rice Thrust block on UG okay; overhead okay to cover; will need several cavities filled with insulation as shown on plans; started 24 hr test at 9 am 1/19/2005 3:16:01 PM
|
INSP-Sprinkler Rough-in | 12/9/2004 | 12/10/2004 | 12/10/2004 | P | FAIL |
Rick Jackson
|
|
|
mick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need resubmittals for UG work as it extends beyond both PIV's for future use; need tracer wire; show details for rod work at base of riser and ductile used from PIV to riser; depth of bury okay 12/10/2004 2:55:12 PM
|