INSP-Final Inspection | 3/21/2005 | 3/22/2005 | 3/22/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire alarm finaled. Hood suppression monitoring point added to panel 3/22/2005 12:59:16 PM
|
INSP-Alarm Testing | | 2/1/2005 | 2/1/2005 | A | DONE |
|
|
|
Tested the FA panel signals to the monitoring station for the DBSI west riser room, acceptable. Dialer signals and smokes for the theatre, acceptable. Tested new phone lines at the Early Learning Center (improperly connected initially) but repaired and acceptable.
The items outstanding are:
DBSI west flow switch
Mongolian BBQ cooking hood monitoring point.
|
INSP-Alarm Testing | | 1/28/2005 | 1/28/2005 | P | DONE |
|
|
|
Tested previous items that requried rework all passed except the water flow on DBSI east sprinkler riser room.
|
INSP-Final Inspection | 1/27/2005 | 1/28/2005 | 1/28/2005 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 4:42:33 PM. Contact: ###-####.
All duct detectors were smoked and functioned properly. (the duct on the roof has an enclosure, needs to have holes drilled to allow air to circulate around the pc board)
All forward flow test valves were wired to the backflow preventer input...they will be disconnected.
Zone labeling needs to be changed.
East side of facility.
West riser room smoke and pull had addresses reversed.
East riser room backflow and main flow were wired incorrectly.
East water flow requires adjustment (> 90 sec), Simplex has been called, apparently something is wrong with the flow switch.
West side of facility, tested all tampers and waterflows, exceptable.
|
INSP-Final Inspection | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/26/2005 at 9:23:30 AM. Contact: ###-####. Rescheduled for 1/28 1/27/2005 9:03:12 AM
|
INSP-Final Inspection | 1/10/2005 | 1/11/2005 | 1/11/2005 | A | FAIL |
Troy Cobbley
|
|
|
The zone labels for the tampers and riser rooms for learning center need changed to be more specific as to device and location. Tamper switches come in as troubles on this system too. The system in the theatres was not tested. Inspection for the new system was started at the duct detectors in DBSI's space. At the first detector inspected I found that the detector was not mounted in the air stream and upon closer inspection found that the detector was barely mounted to the duct and basicaly came off the ductwork into my hand. The sample tube was installed backwards and upside down and the foam donut seals were lying unistalled in a bag on the ceiling. Inspection was stopped. Resubmittals are also required due to additional anti-freeze tamper switches existing but not shown on the plans. 1/11/2005 2:08:57 PM
|
INSP-Final Inspection | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers and teresa's permission until the fire alarm and fire sprinklering of the outside canopies have been finished
|