INSP-Final Inspection | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled 2/22/2005 4:04:36 PM
|
INSP-Final Inspection | 2/4/2005 | 2/7/2005 | 2/7/2005 | P | FAIL |
Troy Cobbley
|
|
|
Provide test papers and repair the inconsistant flow alarm for the DBSI riser. 2/7/2005 4:28:12 PM
|
INSP-Sprinkler Rough-in | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PART |
Troy Cobbley
|
|
|
Forward flush for the new backflow preventors and the final hydro test passed. Corrections have been made to all items previously listed except for items in DBSI's tenant space. Need test papers from contractor. 1/7/2005 11:41:38 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2005 | 1/6/2005 | 1/6/2005 | P | PART |
Troy Cobbley
|
|
|
kerry -call 1st before insp ; Phone #: ###-#### Overhead hydro test for the canopy at Blockbuster and the DBSI canopy passed. Overhead hydro test for the canopy in front of Rite Aid failed. 1/6/2005 3:23:13 PM
|
INSP-Sprinkler Rough-in | 12/28/2004 | 12/29/2004 | 12/29/2004 | A | PART |
Troy Cobbley
|
|
|
Sprinkler rough-in ok except for compliance with notes 89 and 91of review comments, hangers on bottom chord and hung on a single truss. Piping in canopies is allso laying on the bottom chord. This needs changed or provide engineering verification. Pipe straps in the canopies are spaced up to 22' apart in some locations. 18' in others. This does not meet nfpa 13 table 9.2.2.1. Provide canopies that are missing. Lower pendant in dbsi's office as shown on plans. Replace bent pendants in dbsi's space. Relocate pendants that are too close to wall in dbsi's space. Complete all other items on review notes such as forward flush, hydro test ect. 12/29/2004 11:12:24 AM
|
INSP-Final Inspection | 10/4/2004 | 10/4/2004 | 10/4/2004 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave millers and teresa's permission until the fire alarm and fire sprinklering of the outside canopies have been finished
|