Permit Information
Permit NumberFIR04-00608
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 7000 W STATE ST
Project NameSPR NORTHGATE SHOP CENTER
Customer Number 
ePlanReview 
Description
NORTHGATE SHOPPING CENTER * To install new fire sprinkler protection in 4 existing canopies and to verify (with some modifications) 2 existing canopies. Work includes the installation of 4 R.P. backflow devices on 4 existing risers systems with the hydraulic calculation verification of existing systems for the addition of the same. Also to make minor sprinkler changes by adding 11 sprinklers in DBSI Offices and plug one sprinkler in Blockbuster Video tenants. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-01819.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/22/20052/22/20052/22/2005PPASS
DetailsTroy Cobbley
Fire sprinkler finaled 2/22/2005 4:04:36 PM
INSP-Final Inspection2/4/20052/7/20052/7/2005PFAIL
DetailsTroy Cobbley
Provide test papers and repair the inconsistant flow alarm for the DBSI riser. 2/7/2005 4:28:12 PM
INSP-Sprinkler Rough-in1/6/20051/7/20051/7/2005APART
DetailsTroy Cobbley
Forward flush for the new backflow preventors and the final hydro test passed. Corrections have been made to all items previously listed except for items in DBSI's tenant space. Need test papers from contractor. 1/7/2005 11:41:38 AM
INSP-Sprinkler Rough-in/Hydro1/6/20051/6/20051/6/2005PPART
DetailsTroy Cobbley
kerry -call 1st before insp ; Phone #: ###-#### Overhead hydro test for the canopy at Blockbuster and the DBSI canopy passed. Overhead hydro test for the canopy in front of Rite Aid failed. 1/6/2005 3:23:13 PM
INSP-Sprinkler Rough-in12/28/200412/29/200412/29/2004APART
DetailsTroy Cobbley
Sprinkler rough-in ok except for compliance with notes 89 and 91of review comments, hangers on bottom chord and hung on a single truss. Piping in canopies is allso laying on the bottom chord. This needs changed or provide engineering verification. Pipe straps in the canopies are spaced up to 22' apart in some locations. 18' in others. This does not meet nfpa 13 table 9.2.2.1. Provide canopies that are missing. Lower pendant in dbsi's office as shown on plans. Replace bent pendants in dbsi's space. Relocate pendants that are too close to wall in dbsi's space. Complete all other items on review notes such as forward flush, hydro test ect. 12/29/2004 11:12:24 AM
INSP-Final Inspection10/4/200410/4/200410/4/2004PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave millers and teresa's permission until the fire alarm and fire sprinklering of the outside canopies have been finished