Permit Information
Permit NumberFIR04-00619
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 12400 W MCMILLAN RD
Project NameSPR UG CENTENNIAL HIGH SCHOOL
Customer Number 
ePlanReview 
Description
**CENTENNIAL HIGH SCHOOL PERFORMING ARTS CENTER** To install approximately 150'-0" of 6" C-900 CPV fire service supply from a stub located at an existing 8" x 6" tap with key gate valve in the parking lot. The underground fire service supply will be run to a location on the east side of the proposed structure in a location not identified in this permit application. The riser shall be installed to within 1'-0" or less of the finish floor of approved carbon steel piping with listed or approved thrust devices. This service supply will be the supply for a proposed 32,606-ft/2, one story, Type II-B fully fire sprinklered theater / classroom building, of which fire sprinklers are used for area. Added 10/12/2004. To install a 4" PVC underground piping with 4" protected galvanized "remote" riser with Fire Department Connection (FDC) at a point in a curb planter with the supply following the system water supply main into the riser room. That FDC supply from the riser room down through the floor will also be protected galvanized piping. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-01188.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/18/20061/19/20061/19/2006APASS
DetailsTroy Cobbley
permit finaled
INSP-Supply line flush3/8/20053/9/20053/9/2005PPASS
DetailsTroy Cobbley
Underground supply line flush passed 3/9/2005 4:04:56 PM
INSP-Sprinkler Rough-in/Hydro10/28/200410/28/200410/28/2004PPART
DetailsTroy Cobbley
Ok to finish cover of the fdc. Still need to remove the valve and install the ball drip. 10/28/2004 2:27:36 PM
INSP-Sprinkler Rough-in/Hydro10/20/200410/21/200410/21/2004APASS
DetailsTroy Cobbley
Underground supply line hydro is passed. Other items as listed on the previous inspection still need to be addressed. 10/21/2004 1:28:15 PM
INSP-Sprinkler Rough-in/Hydro10/20/200410/20/200410/20/2004AFAIL
DetailsRick Jackson
To verify FDC and vault installation. Re submitted plans are in job trailer.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Need gravel in pit; ball valve will have to be removed after hydro 10/20/2004 11:31:07 AM
INSP-Sprinkler Rough-in/Hydro10/11/200410/11/200410/11/2004PFAIL
DetailsTroy Cobbley
Need approval from bill or dave on modifications to the fire dept. connection location before covering of the pipe 10/11/2004 4:23:33 PM
INSP-Sprinkler Rough-in/Hydro10/7/200410/8/200410/8/2004APART
DetailsTroy Cobbley
Piping under roadway is ok to cover. Thrust blocks and beding is not done yet. Will verify this afternoon. 10/8/2004 12:27:16 PM
INSP-Sprinkler Rough-in/Hydro10/7/200410/8/200410/8/2004PCANC
DetailsTroy Cobbley
Contractor to call in new inspection when the rest of the underground has been installed. Trent to provide pictures of the thrust block on the 45. 10/8/2004 3:19:36 PM