Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00627
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 925 CLOVERDALE RD
Project NameSPR UG BOISE VALLEY ADVENTIST
Customer Number 
ePlanReview 
Description
BOISE VALLEY ADVENTIST SCHOOL * To install 783' of 6" C-900 PVC underground fire service supply main from property line in Cloverdale road in to N.W. corner of a new 17,175-ft/2 single story, Type VB, fully fire sprinklered gymnasium & class addition. The underground riser and lead-in under the footing will be an S.S. Ames ready type riser. The fire sprinklers for this facility will be used for area in the addition and the existing building will also be fire sprinklered to satisfy IFC fire flow requirements. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-00709.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/2/20059/2/20059/2/2005PPASS
DetailsForrest France
Underground fire supply line permit finaled.
INSP-Sprinkler Rough-in7/15/20057/19/20057/19/2005AFAIL
DetailsTroy Cobbley
Inspection was for the cpvc piping in the existing areas. Wrong pendants installed. Will need to verify esch. for pendants. Need to provide eq. bracing for the cpvc mains.
INSP-Sprinkler Rough-in/Hydro4/19/20054/20/20054/20/2005PPASS
DetailsForrest France
Underground fire supply line hydro OK.
INSP-Supply line flush4/1/20054/4/20054/4/2005AFAIL
DetailsForrest France
Fail, discharge hose too small to obtain required flow.
INSP-Sprinkler Rough-in/Hydro1/7/20051/7/20051/7/2005PPART
DetailsTroy Cobbley
Remaining underground supply piping from the stake to the previously approved stub out is ok to cover 1/7/2005 3:08:40 PM
INSP-Sprinkler Rough-in1/6/20051/6/20051/6/2005PPART
DetailsTroy Cobbley
Underground supply piping is ok to cover from the roadway west to the steel stake 1/6/2005 2:47:17 PM
INSP-Sprinkler Rough-in1/5/20051/5/20051/5/2005PPART
DetailsTroy Cobbley
The remaining underground supply piping to the tie in at the street is ok to cover. The underground supply piping from the roadway the the stub out still needs inspection 1/5/2005 2:54:04 PM
INSP-Sprinkler Rough-in1/3/20051/4/20051/4/2005APART
DetailsTroy Cobbley
An additional 180' of supply piping running east is ok to cover 1/4/2005 10:46:09 AM
INSP-Sprinkler Rough-in1/3/20051/3/20051/3/2005PPART
DetailsTroy Cobbley
Underground supply piping is ok to cover for an additional 160' east of the roadway previously approved for cover 1/3/2005 4:00:03 PM
INSP-Sprinkler Rough-in12/29/200412/29/200412/29/2004PPART
DetailsTroy Cobbley
Ok to cover underground supply piping that is located under the roadway only. Per Terry the installer there will be two additional 45 degree elbows in the underground. Resubmitt plans showing these additional valves or provide verification Bill won't require resubmittals. 12/29/2004 1:31:57 PM
INSP-Sprinkler Rough-in/Hydro10/26/200410/26/200410/26/2004PPART
DetailsTroy Cobbley
Underground stubout only is ok to cover 10/26/2004 11:45:12 AM