INSP-Final Inspection | 8/12/2010 | 8/18/2010 | 8/20/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Conference | 7/27/2010 | 8/4/2010 | 8/11/2010 | A | DONE |
Troy Cobbley
|
|
|
Follow up conference with Keith (head of maintenance), on site, for project status and he stated that ADT would be contacting me.
|
INSP-Conference | 7/27/2010 | 7/27/2010 | 7/27/2010 | P | DONE |
Troy Cobbley
|
|
|
I spoke to the on site maintenance director named Keith about getting this permit finished. He was going to contact the fire alarm vendor. I set up a follow up inspection for next week.
|
INSP-Conference | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over the outstanding issues as per the permit history with Keith at ADT.
|
FIR-Aging Inspection | 3/17/2010 | 3/17/2010 | 3/24/2010 | | NR |
Troy Cobbley
|
|
|
Permit information forwarded to Stephanie and to Scott for further action.
|
INSP-Final Inspection | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | FAIL |
Troy Cobbley
|
|
|
Two a/v's are mounted too high. Provide additional a/v's in the restrooms, as marked on plans,and any other common areas. Test smoke detector at the panel. Provide verification of note #14.
|
INSP-Final Inspection | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | FAIL |
Troy Cobbley
|
|
|
Resubmitted plans still do not match sizing or routing as installed. Fix it or resubmit it. Riser on plans shows steel. As installed its half steel and half plastic. Water meter is wrong size. Reinspection fees are being applied.
|
FIR-Aging Inspection | 3/29/2005 | 3/29/2005 | 3/29/2005 | | NR |
Troy Cobbley
|
|
|
work in progress 3/29/2005 11:17:26 AM
|