Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00700
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 2222 S COLE RD
Project NameSPR UG Lot #8, Airway Park Sub
Customer Number 
ePlanReview 
Description
Lot #8, Airway Park Subdivision - (U.G. Shell & Core) Scope of work for this sprinkler permit is to install approx. 160' of 6" C900 PVC, three 6" MJX 90's with thrust blocks per NFPA 13. This permit is for underground only. Stub-up through floor @1'-0". Riser room will be in a 1-hour rated riser room. Sprinkler design will not use an exteriro control valve. To construct a new 11,500 square foot, one story, masonry and wood framed shell and core building. This building is fully fire sprinkled. This building will contain 5 future tenant spaces. Four of the proposed tenant space will have a vanilla finish and include one accessible restroom (lease spaces #106-#109). The remaining 5610 square foot tenant space will be finished for Fast Glass (BLD04-02145). This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvements permits will be required to finish each tenant space for occupancy. All construction per the approved plans and attached comment list. #04-599/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/6/20054/6/20054/6/2005PPASS
DetailsForrest France
fire sprinkler finaled
INSP-Supply line flush3/28/20053/29/20053/29/2005APASS
DetailsTroy Cobbley
underground supply hydro passed 3/29/2005 10:57:00 AM
INSP-Sprinkler Rough-in3/15/20053/17/20053/17/2005PPART
DetailsTroy Cobbley
Underground flush is ok. Overhead rough-in is ok except that the sprig ups need to be centered inbetween the trusses as per the review comments. The line over the riser room needs to be inspected when installed. Need letter stating that it is ok to hang the sprinkler piping from the bottom chord of the trusses. 3/17/2005 4:12:55 PM
INSP-Sprinkler Rough-in/Hydro11/18/200411/19/200411/19/2004PPASS
DetailsTroy Cobbley
Underground supply line is ok to cover 11/19/2004 2:36:55 PM
INSP-Sprinkler Rough-in/Hydro11/18/200411/18/200411/18/2004PCANC
DetailsTroy Cobbley
Contact: Chris - UG Cover Inspection - Would like around 4 PM this afternoon, please call to confirm; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley