Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR04-00749
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 403 S 11TH ST
Project NameSPR UG 11TH & MYRTLE PRO SHELL
Customer Number 
ePlanReview 
Description
THIS IS A TWO PHASE PROJECT. DECEMBER 17, 2004 - 11TH & MYRTLE PROFESSIONAL CENTER (SHELL & CORE - PHASE 1) - To install a lead-in of 6" C-900 PVC, and a lead-out of 4" C-900 PVC under the footing and up through an identified fire sprinkler control room with approved carbon steel pipe to approximately 6" above finish floor, in preparation for the construction of a 25,488-ft/2, three story Type III-B office shell building, which will be fully fire sprinklered. Fire sprinklers are being used for area. This is a partial permit and illustrates work from the underground risers (4" and 6" to the first 45º ells only). This fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-02153. MARCH 3, 2005 - 11TH & MYRTLE PROFESSIONAL CENTER (SHELL & CORE - PHASE 2) To install the remaining 6" C-900 PVC lead-in from the property line to the 45º and 4" C-900 PVC lead-out to the remote FDC with pit drain capabilities for the fire protection supply requirements of the 25,488-ft/2, three story Type III-B office shell building, which will be fully fire sprinklered. Fire sprinklers are being used for area. This fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-02153.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/19/20057/21/20057/21/2005APASS
DetailsForrest France
Underground fire supply permit finaled.
INSP-Sprinkler Rough-in/Hydro7/5/20057/6/20057/6/2005APART
DetailsForrest France
Remote FDC piping hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro6/30/20057/5/20057/5/2005ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 6/30/2005 at 3:31:19 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 5 2005 7:17AM.
INSP-Sprinkler Rough-in/Hydro6/21/20056/23/20056/23/2005APART
DetailsForrest France
Underground fire supply hydrostatic test passed. Remote FDC underground pipe not tested at this time.
INSP-Supply line flush5/10/20055/13/20055/13/2005APART
DetailsForrest France
Underground fire supply line and remote FDC flush satisfactory. Still need hydrostatic test performed.
INSP-Sprinkler Rough-in3/25/20053/25/20053/25/2005PPASS
DetailsTroy Cobbley
george richardson ###-#### Underground fire supply and fdc connection ok to cover, verify gravel install below ball drip. 3/25/2005 1:13:04 PM
INSP-Sprinkler Rough-in12/27/200412/28/200412/28/2004APART
DetailsRick Jackson
11 am for UG cover Phase I is completed to first 45 outside the building; rods used for the entire length 12/28/2004 12:16:40 PM
INSP-Sprinkler Rough-in12/23/200412/27/200412/27/2004PPART
DetailsRick Jackson
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles UG is okay to cover for base of riser; will complete full cover to first 45 on 12/28 12/27/2004 3:39:39 PM