Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR04-00812
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 917 S LUSK ST
Project NameSPR UG KEYNETICS
Customer Number 
ePlanReview 
Description
KEYNETICS OFFICE (SHELL & CORE) - To install a 6" fire service supply into the south corner of a new 27,958-ft/2 three story, structure. This work will be accomplished in stages. The first is stub out under the footing and the second to an approved water source. A separate plan/s and permit will be required for the overhead fire sprinkler system. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD04-02409.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/15/200512/15/200512/15/2005PPASS
DetailsForrest France
Underground fire supply line finaled.
INSP-Sprinkler Rough-in/Hydro12/9/200512/12/200512/12/2005ADEFR
DetailsForrest France
mike Note: 24 hr air test; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles NOTE: Wrong permit number called in, this was meant for FIR05-00385 for the overhead, not under FIR04-00812 for the associated UG supply.
INSP-Sprinkler Rough-in11/3/200511/4/200511/4/2005PPART
DetailsForrest France
2nd floor corridor hard lid and 1st floor restrooms hard lid are okay to cover for overhead rough-in.
INSP-Supply line flush8/9/20058/9/20058/9/2005APART
DetailsForrest France
Two hour hydrostatic test and supply line flush both passed inspection.
INSP-Supply line flush7/27/20057/27/20057/27/2005AFAIL
DetailsForrest France
Underground fire supply work appears to be installed in a satisfactory manner, however the resubmitted plans and notes with scope of work does not address phase 2 (connection to city supply) work. This work must be submitted and approved prior to field inspection and sign off.
INSP-Supply line flush1/18/20051/19/20051/19/2005APART
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice UG stub out only - okay; used one piece riser 1/19/2005 10:10:01 AM