INSP-Final Inspection | 1/26/2007 | 1/29/2007 | 1/29/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | FAIL |
Troy Cobbley
|
|
|
See city approved plans for items still needing completed.
|
INSP-Final Inspection | 1/2/2007 | 1/3/2007 | 1/3/2007 | A | FAIL |
Troy Cobbley
|
|
|
There were not approved and updated plans on site for the inspection.
|
INSP-Final Inspection | 2/13/2006 | 2/14/2006 | 2/14/2006 | A | FAIL |
Troy Cobbley
|
|
|
See city approved plans for deficiencies which include resubmitting plans for piping changes in the second floor storage room remote area. The riser is missing items for the final such as stickers and the backflow preventor is incorrect.
|
INSP-Supply line flush | 1/10/2006 | 1/10/2006 | 1/10/2006 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PASS |
Troy Cobbley
|
|
|
overhead / underground hydro passed
|
INSP-Sprinkler Rough-in | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover
|
INSP-Sprinkler Rough-in | 10/3/2005 | 10/4/2005 | 10/4/2005 | A | PART |
Troy Cobbley
|
|
|
Office area only is ok to cover. Two upright sprinkler heads are blocked by duct work as marked on the approved plans. This will need to be fixed prior to final.
|