Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00051
StatusFinaled
Name PROTEX
Site Address 121 N 9TH ST Unit: 600
Project Namealm - PLAZA 121-6TH FLR
Customer Number 
ePlanReview 
Description
The data has been moved to a Word document attached to this case.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/18/20064/18/20064/18/2006PPASS
DetailsForrest France
Fire alarm passed final inspection, permit finaled.
INSP-Final Inspection2/28/20053/1/20053/1/2005APART
DetailsTroy Cobbley
Temporary occupancy given. Fire alarm panel and NAC panels inspected. Duct detectors on the sixth floor inspected. Induct detectors at main supply and returns on first through sixth floor inspected. Pull stations on all floors inspected. Audio visuals on sixth floor and first floor lobby inspected. Individual a/v's on first through sixth and basement inspected. All sprinkler monitoring points inspected. All other items not inspected. Plans will need to be resubmitted with changes which include ceiling mounted a/v's, deletion of pull on sixth floor, additional heat in penthouse and relocated NAC panels. 3/1/2005 2:53:41 PM
INSP-Final Inspection2/28/20052/28/20052/28/2005PFAIL
DetailsTroy Cobbley
Items tested included annunciation, manual pull stations and induct smoke detectors for common supply/returns for 2nd - 6th floors. Also tested duct smoke detectors on hvac units on 6th floor only. Tested all tamper switches and flow switches for basement through penthouse. Items still needing testing for temporary occupancy are elevator recall for the new elevators, induct detectors on first floor and duct detectors in penthouse and NAC supervision 2/28/2005 4:06:07 PM
INSP-Final Inspection2/23/20052/25/20052/25/2005AFAIL
DetailsTroy Cobbley
terri ###-#### Fire alarm is not ready for inspection. Fire pump controler handle has been broken. Fire pump is in phase reversal (running backwards). Elevator car 2 was not ready for recall testing. No sprinkler heads on second floor. Items tested are phones, battery loss, ac loss, pull stations in basement and first floor, loss of power at pump, pump running and phase reversal. System is not ready for testing 2/25/2005 2:08:54 PM
INSP-Alarm Testing2/18/20052/24/20052/24/2005ACANC
DetailsTroy Cobbley
terri ###-####
INSP-Final Inspection2/23/20052/24/20052/24/2005ACANC
DetailsTroy Cobbley
terri ###-####