Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR05-00056
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 4027 W QUAIL HILL CT
Project NameSPR HILLSIDE-DILDINE RES.
Customer Number 
ePlanReview 
Description
(HILLSIDE-DILDIN RESIDENCE) To install a modified 13D system in a new 3,676-ft/2 two story single family dwelling with a 697-ft/2 attached three car garage with sprinkler barrier protection between garage and dwelling spaces connected. This system shall be equipped with an alarm initiating device, commonly referred to as a flow switch connected to an outside audible alarm. All fire sprinkler work and related shall be per IFC 903.2.8, NFPA 13:8.4.5, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-02171.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/26/20055/26/20055/26/2005PPASS
DetailsTroy Cobbley
Fire sprinkler finaled
INSP-Supply line flush5/23/20055/24/20055/24/2005APASS
DetailsTroy Cobbley
Fire sprinkler finaled
INSP-Final Inspection5/20/20055/23/20055/23/2005PFAIL
DetailsTroy Cobbley
Underground supply line has not been flushed and flow switch and alarm bell needs tested. Need canopy on pendant that had to be relocated.
INSP-Final Inspection5/17/20055/18/20055/18/2005PFAIL
DetailsTroy Cobbley
no water to fill system to test alarms, need all items for final checked, need to flush underground. Pendant head inside is too close to trim work. No inspection done, these are just items on the way out.
INSP-Sprinkler Rough-in/Hydro2/15/20052/16/20052/16/2005AFAIL
DetailsTroy Cobbley
Provide resubmittals showing the modified piping at the entrance and provide insulation on the backside on the vertical risers 2/16/2005 8:39:39 AM
INSP-Sprinkler Rough-in/Hydro2/16/20052/16/20052/16/2005PPASS
DetailsTroy Cobbley
Piping is ok to cover 2/16/2005 1:07:29 PM