INSP-Final Inspection | 12/13/2005 | 12/16/2005 | 12/16/2005 | A | PASS |
Forrest France
|
|
|
Fire sprinkler passed final inspection, defficient items have been completed.
|
INSP-Supply line flush | 10/28/2005 | 11/1/2005 | 11/1/2005 | P | PASS |
Forrest France
|
|
|
Fire sprinkler shell work passed inspection.
|
INSP-Final Inspection | 10/28/2005 | 10/28/2005 | 10/28/2005 | P | PART |
Forrest France
|
|
|
Temporary approval given with Dave Hanneman"s permission pending flow test at roof standpipe, 2nd floor restroom walls, tenant demising walls.
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | FAIL |
Forrest France
|
|
|
Three items remain not completed on correction notice including to verify required flow/pressure at the roof standpipe (500gpm @ 100psi see note #35), area above the restrooms 2nd floor is lacking full sprinkler coverage-full height wall must be completed or provide uprights above this space, tenant demising walls for future tenants have disrupted shell sprinkler coverage in several areas.
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | NR |
Forrest France
|
|
|
Contractor states all items on correction notice are complete (subject to verification by inspector) except 3 items, no re-inspection performed at this time.
|
INSP-Sprinkler Rough-in/Hydro | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | FAIL |
Forrest France
|
|
|
A 13 item correction list was discussed and left with Brian of DeBest sprinkler for the shell rough-in.
|
INSP-Sprinkler Rough-in/Hydro | 10/21/2005 | 10/21/2005 | 10/21/2005 | P | NR |
Forrest France
|
|
|
Cancel inspection per conversation with Brian.
|
INSP-Final Inspection | 10/20/2005 | 10/20/2005 | 10/20/2005 | P | FAIL |
Forrest France
|
|
|
PIV tamper is not adjusted correctly, the flow switch operates intermittently causing the outside bell to cycle on and off, no overhead looked at today due to time constraints.
|
INSP-Final Inspection | 10/19/2005 | 10/21/2005 | 10/20/2005 | A | CANC |
Forrest France
|
|
|
contact brian calkins.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Final Inspection | 10/13/2005 | 10/14/2005 | 10/14/2005 | A | FAIL |
Forrest France
|
|
|
Alarms not completed for final, need to cut heads in drop ceiling area north exit corridor, cert. backflow preventers, sign and fill antifreeze system, eq FDC, perform forward flow test, provide sign at standpipe and flow test see note #29 and 30 on plan review, exterior wall needs to be built at riser for WPI, drain and FDC, install outside bell, this is not a comprehensive or all inclusive list of remaining items.
|
INSP-Sprinkler Rough-in/Hydro | 10/12/2005 | 10/13/2005 | 10/13/2005 | A | PART |
Forrest France
|
|
|
Aboveground hydrostatic test for the shell permit passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 10/10/2005 | 10/11/2005 | 10/11/2005 | P | CANC |
Troy Cobbley
|
|
|
No hydro test done. Water has not been put in system yet.
|
INSP-Sprinkler Rough-in | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | PART |
Troy Cobbley
|
|
|
I looked at the noted problems and they have been corrected. Temporary pendant heads have been installed in the west elevator lobby until the ceiling has been installed. First floor service corridor and the second floor service corridor are ok for cover.
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | CANC |
Forrest France
|
|
|
Wrong permit called in, this inspection was for tenant P.F. Chang's FIR05-00378, not the core and shell.
|
INSP-Sprinkler Rough-in | 9/16/2005 | 9/16/2005 | 9/16/2005 | A | FAIL |
Forrest France
|
|
|
See approved plans for annotations of defficient areas, this inspection was called in under the wrong permit number fir05-00297 for the adjacent 4 story Foster building.
|
INSP-Sprinkler Rough-in | 8/26/2005 | 8/30/2005 | 8/29/2005 | A | CANC |
Unknown
|
|
|
Contact: Jim - Rough in; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in | 7/18/2005 | 7/19/2005 | 7/19/2005 | A | PART |
Forrest France
|
|
|
Shell rough-in satisfactory for first floor SE corner future tenant space as initialed on approved plans.
|
INSP-Sprinkler Rough-in | 7/18/2005 | 7/18/2005 | 7/18/2005 | P | FAIL |
Forrest France
|
|
|
Contractor could not produce approved plans for review on site. Noted some deficiencies including missing EQ bracing, missing retaining straps, and sprig-ups with ssu heads in the pendent position.
|
INSP-Sprinkler Rough-in/Hydro | 8/12/2005 | 8/15/2005 | | A | |
Unknown
|
|
|
Contact: Brian; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 8/10/2005 | 8/12/2005 | | A | |
Unknown
|
|
|
contact: Brian - Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
|