Permit NumberFIR05-00111
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 403 S 11TH ST
Project NameSPR OH 11TH & MYRTLE PRO SHELL
Customer Number 
ePlanReview 
Description
11TH & MYRTLE PROFESSIONAL CENTER (SHELL & CORE) - To install a complete shell fire sprinkler and standpipe system in a new 25,488-ft/2 three story Type III-B office shell building. Underground fire service supply is permitted under FIR04-00749. Separate plans and permits are required to complete each tenant space/improvement. Fire sprinklers are used for area. 1st floor 8,496-ft/2, 2nd floor is 8,496-ft/2, 3rd floor is 8,496-ft/2. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-02153.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/25/20057/25/20057/25/2005PPASS
DetailsForrest France
Fire sprinkler permit finaled, sufficient flow has been verified through the system backflow preventer.
INSP-Final Inspection7/21/20057/22/20057/22/2005AFAIL
DetailsForrest France
Foreward flow test failed to produce required gpm.
INSP-Final Inspection7/19/20057/21/20057/21/2005AFAIL
DetailsForrest France
Provide foreward flow test of backflow preventer, provide NFPA25, attatch calc. sticker, install missing escutcheon at riser room, sinage to indicate areas controled by system control valves.
INSP-Sprinkler Rough-in/Hydro7/5/20057/6/20057/6/2005AFAIL
DetailsForrest France
Need lateral EQ brace installed on the last piece of main 2nd floor SW side per NFPA 13 9.3.5.3.4, attatch retaining straps in two locations 2nd floor, missing hangers on penthouse branch line supply, provide guages at floor control manifolds as shown on approved plans.
INSP-Final Inspection7/6/20057/6/20057/6/2005PPART
DetailsForrest France
Overhead hydrostatic test of 2nd and 3rd floor shell pipe passed.
INSP-Sprinkler Rough-in/Hydro6/30/20057/5/20057/5/2005ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 6/30/2005 at 3:34:44 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 5 2005 7:10AM.
INSP-Sprinkler Rough-in/Hydro6/21/20056/23/20056/23/2005AFAIL
DetailsForrest France
Shell area first floor needs hanger at 1" arm over, head cage in elevator pit, SW is blocked in electrical room, inadequate coverage at bottom stair landings. 2nd and 3rd floor shell piping not ready for inspection.
INSP-Sprinkler Rough-in/Hydro6/23/20056/23/20056/23/2005PPART
DetailsForrest France
Standpipe and overhead hydro test of first floor piping OK.