Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00112
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 12551 W EXECUTIVE DR
Project NameSPR GE SUPPLY
Customer Number 
ePlanReview 
Description
(GE SUPPLY - OFFICE, SALES AREA, STORAGE MEZZANINE) To modify and existing shell fire sprinkler system installed under FIR04-00773, for a 3,100-ft/2 office/wholesale area within an existing 16,655-ft/2 warehouse building. A storage mezzanine will be located above the office area. After the office is constructed, the warehouse will have a floor area of about 12,521-ft/2 inside the building, 3,100-ft/2 on the mezzanine, and 1,000-ft/2 of outside covered storage. The fire sprinkler work is related to, the exterior storage canopy, interior nonbearing walls, interior stairway, 3 restrooms, suspended ceilings and mezzanine. This building is fire sprinklered for fire area and for high-piled storage. This fire protection work shall comply with the IFC 2003 and the permit review comments; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD05-00288.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/19/20055/19/20055/19/2005PPASS
DetailsTroy Cobbley
Fire sprinkler finaled
INSP-Final Inspection5/17/20055/18/20055/18/2005PFAIL
DetailsTroy Cobbley
Not ready for final
INSP-Sprinkler Rough-in/Hydro5/5/20055/6/20055/6/2005APART
DetailsTroy Cobbley
Above ground hydro test passed
INSP-Sprinkler Rough-in/Hydro5/4/20055/5/20055/5/2005PCANC
DetailsTroy Cobbley
The fdc wasn't included in the hydro test. Mike said he would change that and call it in for tomorrow
INSP-Sprinkler Rough-in4/20/20054/20/20054/20/2005PPART
DetailsTroy Cobbley
Office area is ok to cover. Resubmittals needed for sprinklers added under both the stairs. Final spacing of pendants in office will be checked when walls are built.