INSP-Final Inspection | 4/20/2005 | 4/21/2005 | 4/21/2005 | A | PASS |
Forrest France
|
|
|
Overhead fire sprinkler rough-in pass. Flow req. verified. Additional rack sprinklers on separate permit not installed.
|
INSP-Final Inspection | 4/19/2005 | 4/20/2005 | 4/20/2005 | P | FAIL |
Troy Cobbley
|
|
|
Could not get the required pressure to pass forward flush test. Still need to verify sprinkler spacing as noted on previous inspection
|
INSP-Sprinkler Rough-in/Hydro | 4/18/2005 | 4/18/2005 | 4/18/2005 | P | FAIL |
Troy Cobbley
|
|
|
Multiple branchlines have been relocated and now appear to exceed 99 sq.ft. max. spacing. Provide verification that afcon 303 rings have been used for the trapeze hangers. Provide flexible cplings at the top and bottom of the risers at the inracks. Provid
|
INSP-Conference | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | FAIL |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 4/15/2005 at 2:18:57 PM. Contact: ###-####. No body at the site for the conference. I called Treasure Valley's office prior to showing up but the lady who answered the phone wasn't sure who I needed to talk
|
INSP-Sprinkler Rough-in/Hydro | 4/13/2005 | 4/14/2005 | 4/14/2005 | A | PASS |
Forrest France
|
|
|
Overhead hydro. test passed. Rough-in OK for TI office space only.
|
INSP-Sprinkler Rough-in/Hydro | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | FAIL |
Forrest France
|
|
|
Hydro. AG not ready for test, Rough in fail; need proper temp. heads in storage room, Upright in break room is too far below deck, Upright heads in office and open office are blocked by ductwork in some locations.
|