Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR05-00124
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 925 N CLOVERDALE RD
Project NameSPR OH EXISTING ADVENTIST SCH
Customer Number 
ePlanReview 
Description
BOISE VALLEY ADVENTIST SCHOOL-EXISTING * To install a complete overhead dry-pipe and extend the wet fire sprinkler system throughout the entire existing school which will be connected to a riser manifold installed under FIR04-00737 (17,175-ft/2 single story, Type V-B, gymnasium & class addition). The existing building is a 14,599-ft/2, Type V-1 hr., building. The fire sprinklers are used for area in the addition and satisfy IFC (hydrants) fire flow requirements. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD04-00709.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/29/20058/30/20059/2/2005APASS
DetailsForrest France
Attic spacing issues have been corrected and inspected, permit finaled.
INSP-Final Inspection8/18/20058/18/20058/18/2005PFAIL
DetailsTroy Cobbley
Maximum head spacing for the attic heads is 120sq. ft. per review note #9. The uprights are overspaced in many locations off the walls in the attic. Upright sprinklers are not sloped with roof deck at the southend of the attic. CPVC piping is not tented correctly in the attic at the central area. Verify that the cpvc piping exposed in the mechanical room can be. Remove switch at the air compressor.
INSP-Sprinkler Rough-in/Hydro8/8/20058/9/20058/9/2005APASS
DetailsTroy Cobbley
Eq bracing on the cpvc main is done and the pendant heads are now correct. Need to inspect the dry system and hydro test the wet system and all other final items.
INSP-Sprinkler Rough-in/Hydro7/28/20057/29/20057/29/2005PPASS
DetailsTroy Cobbley
contact dave. finish 24 hr air.; Air test passed
INSP-Sprinkler Rough-in/Hydro7/27/20057/28/20057/28/2005PPART
DetailsTroy Cobbley
contact dave. 24 hr air test.; Starting pressure at just above 43psi at 12:00
INSP-Sprinkler Rough-in/Hydro7/27/20057/27/20057/27/2005PPASS
DetailsTroy Cobbley
Dry system hydro tested passed
INSP-Sprinkler Rough-in/Hydro7/27/20057/27/20057/27/2005PFAIL
DetailsTroy Cobbley
Inspection was for the cpvc piping in the existing areas. Wrong pendants installed. Will need to verify esch. for pendants. Need to provide eq. bracing for the cpvc mains
INSP-Conference7/14/20057/14/20057/14/2005PDONE
DetailsTroy Cobbley
I spoke to Dave with Debest about possible rated walls in the existing school. I referred him back to the architect. I also noted exposed wood including beams and 2x4's located above the ceiling that have no sprinkler protection.
FIR-Aging Inspection6/15/20056/15/20056/15/2005 DONE
DetailsTroy Cobbley
Work in progress