Permit NumberFIR05-00159
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1803 W WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReview 
Description
(STEELWOOD FLEXIBLE COMMERCIAL CONDOMINIUMS) This building is fire sprinklered for building area increase. To remove and reinstall fire sprinkler piping in the southwest corner between columns 1 and 3, depicted in earlier submittals for demolition of the roof structure and the reinstallation of the same which includes the temporary relocation of the FDC. To modify the existing riser from an "offset" to a "vertical," and add sprinkler protection underneath 13 added overhead doors with the modification of the existing 2" overhead lines to accommodate the same. To relocate and add fire sprinkler protection for new future tenant partitions, a hallway, and the modifications to system protection for future offices. The new tenant warehouse occupancies were verified for pipe modification to a .247/1475-ft/2 density (except one which exceeds this area). To all add fire sprinkler protection in the East New Overbuild Canopy and West Overbuild Canopy. This permit is not included for establishment for a Certificate of Occupancy with any occupancy use. The fire sprinkler system work shall be maintained in accordance with minimum requirements of IFC 901.4 and Chapter 14, complying with the installation requirements established in NFPA 13-2003 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this permit, to provide witness of compliance verification of meeting minimum code. This permit is attached to building permit: BLD04-02470.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/6/20067/6/20067/6/2006PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro7/5/20067/5/20067/5/2006PPASS
DetailsTroy Cobbley
Aboveground hydro test passed.
INSP-Final Inspection6/29/20066/29/20066/29/2006PFAIL
DetailsTroy Cobbley
Forward flush passed. Need to address combustibles in the attic space above the west long corridor, above ground hydro test and the upright heads that are spaced too close at the peak
INSP-Final Inspection6/28/20066/28/20066/28/2006PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 6/28/2006 at 10:23:41 AM. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro1/10/20061/11/20061/11/2006APASS
DetailsTroy Cobbley
The two south facing overbuilds are ok to cover.
FIR-Aging Inspection8/16/20058/16/20058/16/2005 NR
DetailsTroy Cobbley
work in progress