Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00160
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 100 E IDAHO ST
Project NameSPR MISTI UG & SUPPLY REROUTE
Customer Number 
ePlanReview 
Description
MISTI UNDERGOUND & SERVICE SUPPLY REROUTE FOR ST. LUKE'S MRI and BD SHELL & CORE ADDITION * To reroute the existing 6" underground into the MSTI/St. Lukes connecting tunnel corridor, running south and across the connecting tunnel corridor into the MISTI fire sprinkler control room, while abandoning the existing underground and overhead supply piping in the fire sprinkler room. This fire protection work shall comply with the IFC 2003 and the permit review comments and conditions list; each regulated by the Fire Chief. The review comments, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD04-00094.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/16/20056/16/20056/16/2005PPASS
DetailsForrest France
Fire sprinkler finaled, Troy Cobbley has tested the flow switch during alarm testing under the associated fire alarm permit fir05-00232.
INSP-Sprinkler Rough-in/Hydro4/26/20054/27/20054/27/2005PPART
DetailsForrest France
Underground fire supply piping within building passed rough-in inspection. Need to verify flow switch operation prior to final.
INSP-Supply line flush4/26/20054/27/20054/27/2005APASS
DetailsForrest France
Fire supply line flush satisfactory.
INSP-Sprinkler Rough-in/Hydro4/27/20054/27/20054/27/2005PPASS
DetailsForrest France
Underground fire supply hydrostatic test passed.