Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR05-00198
StatusFinaled
Name MOUNTAIN ALARM
Site Address 3110 W CRESCENT RIM DR
Project Namealm - Crescent Rim Apartments
Customer NumberPARKVIEW APARTMENTS
ePlanReview 
Description
To replace an existing manual fire alarm system due to a required elevator control upgrade. The required manual fire alarm system includes notification throughout. Single station smoke detectors are required per IFC 2003, 907.3.2. (No construction due to remodeling is being done, therefore the exceptions will apply.)

8/1/2005 - The manual pull stations (located east and west stairways) will be relocated to the code required five (5) ft of the exit.

11/2/2005 - Received plan modification to indicate the actual installation. WBB back boxes are required for WP System Sensor notification appliances.

There is no associated building permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/24/20061/24/20061/24/2006 PASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/21/200512/22/200512/22/2005AFAIL
DetailsTroy Cobbley
Horns out of sync in the lobbies and the strobes are out of sync between the lobby and the walkways. Need to run the new NAC panel through the hoops, verify signals and get the NFPA 72 forms.
INSP-Final Inspection12/13/200512/14/200512/14/2005AFAIL
DetailsTroy Cobbley
Horns and strobes not sync'd. Need nfpa 72 forms and to verify signals.
INSP-Final Inspection12/12/200512/13/200512/13/2005AFAIL
DetailsTroy Cobbley
See city approved plans for items from the past inspection that weren't corrected yet. Strobes aren't sync'd. A reinspection fees is being applied.
INSP-Final Inspection12/7/200512/7/200512/12/2005PCANC
DetailsTroy Cobbley
lynda; Phone #: 4###-#### Internet Inspection Request from: Barbara Moore
INSP-Final Inspection12/5/200512/6/200512/7/2005AFAIL
DetailsTroy Cobbley
Nobody showed up for inspection
INSP-Final Inspection11/28/200511/29/200511/30/2005ADEFR
DetailsForrest France
linda; Phone #: ###-#### Per conversation with Linda the inspection will be scheduled for Monday 12/5 as agreed.
INSP-Final Inspection11/21/200511/22/200511/22/2005PCANC
DetailsForrest France
No time available for this inspection today.
INSP-Final Inspection9/13/20059/14/20059/14/2005AFAIL
DetailsTroy Cobbley
lynda; Phone #: ###-####
See city approved plans, sheet 1 for list of items needing correction.
INSP-Final Inspection9/8/20059/9/20059/13/2005ACANC
DetailsForrest France
Contractor has rescheduled inspection for a later date.
INSP-Final Inspection8/29/20058/30/20058/30/2005ACANC
DetailsForrest France
No time available today for this inspection, spoke with linda from mountain alarm at ###-####, she will reschedule inspection for next week.