Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00217
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4840 N CLOVERDALE RD
Project NameSPR SLRMC INTERNAL MEDICINE
Customer Number 
ePlanReview 
Description
(SAINT LUKES INTERNAL MEDICINE BUILDING) To install a complete light hazard, wet and dry pipe overhead fire sprinkler systems within a new 11,274-ft/2, single story, wood framed, medical office building, with a 600-ft/2 covered driveway entry canopy and a 459-ft/2 covered patio area. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-00217.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/23/20058/23/20058/23/2005PPASS
DetailsForrest France
Calculations for spacing have been verified. Fire sprinkler permit finaled.
INSP-Final Inspection8/19/20058/19/20058/19/2005PFAIL
DetailsTroy Cobbley
Still need to verify that the sprinkler spacing in the conference room and the additional dry pendants are approved with resubmittals.
INSP-Final Inspection8/17/20058/17/20058/17/2005PFAIL
DetailsTroy Cobbley
Forward flush passed but need to certify the backflow preventor, provide verification of the spacing in the conference room and the additional dry pendants with bill as previously requested. Verify that the valve for the ball drip in the pit is open
INSP-Sprinkler Rough-in/Hydro7/7/20057/7/20057/7/2005PPASS
DetailsTroy Cobbley
Wet system hydro test passed. Sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro6/29/20056/30/20056/30/2005PPASS
DetailsTroy Cobbley
24 hour air test passed on dry system
INSP-Sprinkler Rough-in/Hydro6/29/20056/29/20056/29/2005PPART
DetailsTroy Cobbley
Started 24 hour air test with 50psi on guage.
INSP-Sprinkler Rough-in/Hydro6/16/20056/16/20056/16/2005PPASS
DetailsTroy Cobbley
200 lb hydro test on the dry pipe system passed.
INSP-Sprinkler Rough-in/Hydro6/7/20056/7/20056/7/2005PPART
DetailsTroy Cobbley
The remaining part of the dry system passed. Not all arm overs have been installed and will need inspected. Final head spacing to be checked when t-bar is installed.
INSP-Sprinkler Rough-in/Hydro6/3/20056/3/20056/3/2005PPART
DetailsTroy Cobbley
See city approved plans for location where wet system can be covered as of 6/3/05.
INSP-Sprinkler Rough-in/Hydro6/1/20056/1/20056/1/2005PPART
DetailsTroy Cobbley
The dry system rough-in is ok except for one head needs to be added in the south east room. Contractor needs to get with Bill Alexander to see if a resubmittal will be required for this head and the three other dry uprights added at each of the entrances.
INSP-Sprinkler Rough-in/Hydro5/19/20055/19/20055/19/2005PPART
DetailsTroy Cobbley
Sprinkler piping in the west drive thru canopy can be covered. As stated in the previous inspection entry, plans need to be resubmitted due to changes.
INSP-Supply line flush5/17/20055/17/20055/17/2005PPASS
DetailsTroy Cobbley
Underground supply line flush and underground hydro test passed. I had contractor measure leakage. 5 1/2 quarts was allowed and it lost approx. 2 1/2 to 3 quarts
INSP-Sprinkler Rough-in5/17/20055/17/20055/17/2005PFAIL
DetailsTroy Cobbley
I started rough-in inspection on the dry system at the request of the onsite sprinkler fitter but could not do the inspection due to pipe routing and sizing not matching approved plans. Upright heads are not spaced in accordance with NFPA 13 for obstruct