Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR05-00239
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 314 S 9TH ST
Project NameSPR UG FOSTER BUILDING
Customer Number 
ePlanReview 
Description
(FOSTER BUILDING UNDERGROUND REPLACEMENT) To install approximately 100 feet of 6" C-900 PVC connected in W. Broadway, running north along "BODO #4" and into the south east corner basement with Ductile Iron (or similar) approximately 6" inside the wall with a 6" X 11" adapter. This service supply will have an outside Post Indicator Control (supervised) located in at the sidewalk in W. Broadway. All fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD05-00239.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/20/20064/21/20064/21/2006APASS
DetailsForrest France
UG fire supply line permit finaled.
INSP-Supply line flush3/27/20063/28/20063/28/2006PPART
DetailsForrest France
UG supply line flush performed satisfactory.
INSP-Sprinkler Rough-in3/27/20063/28/20063/28/2006APART
DetailsForrest France
UG hydrostatic test passed inspection.
INSP-Sprinkler Rough-in/Hydro3/23/20063/24/20063/24/2006PCANC
DetailsForrest France
UG hydro test canceled by contractor, not ready for inspection.
INSP-Sprinkler Rough-in8/18/20058/19/2005 A 
DetailsUnknown
Contact: Charles - UG Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley