INSP-Final Inspection | 9/22/2005 | 9/23/2005 | 9/23/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled. Insulation has been installed in the existing dormers and the standard heads re-installed.
|
INSP-Final Inspection | 9/19/2005 | 9/20/2005 | 9/21/2005 | A | FAIL |
Troy Cobbley
|
|
|
Need hydraulic calcs for the dormer areas
|
INSP-Final Inspection | 9/16/2005 | 9/16/2005 | 9/16/2005 | P | FAIL |
Troy Cobbley
|
|
|
There are still obstructions to the upright sprinkler heads above the ceiling in the existing chapel and I need calculations for the attic heads in the existing dormers.
|
INSP-Final Inspection | 9/14/2005 | 9/15/2005 | 9/15/2005 | P | CANC |
Troy Cobbley
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2005 | 9/12/2005 | 9/12/2005 | P | PART |
Troy Cobbley
|
|
|
See approved plans for locations of remaining deficiencies. Also still need head wrench, sign on control valve and forward flush
|
INSP-Sprinkler Rough-in | 9/7/2005 | 9/9/2005 | 9/9/2005 | A | CANC |
Forrest France
|
|
|
No time for this inspection today, spoke with Mike from TV to schedule for monday 9/12 per our agreement.
|
INSP-Sprinkler Rough-in/Hydro | 8/24/2005 | 8/24/2005 | 8/24/2005 | P | PART |
Forrest France
|
|
|
Dry system 24 hour air test passed with the maximum allowable loss of 1.5 psi, air pressure at 2:00 p.m 8/24/05 was 40.5 psi.
|
INSP-Sprinkler Rough-in/Hydro | 8/23/2005 | 8/23/2005 | 8/23/2005 | P | PART |
Forrest France
|
|
|
Begin 24 hour air test of the dry system at 1:55 p.m 8/23/05 at 42psi.
|
INSP-Sprinkler Rough-in/Hydro | 8/18/2005 | 8/19/2005 | 8/19/2005 | P | PASS |
Troy Cobbley
|
|
|
hydro test for overhead passed
|
INSP-Sprinkler Rough-in/Hydro | 6/9/2005 | 6/10/2005 | 6/10/2005 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping in new addition is ok to cover.
|
INSP-Sprinkler Rough-in | 6/7/2005 | 6/7/2005 | 6/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Tenting in new addition is passed. Storage areas and concealed combustible areas still need addressed
|
INSP-Sprinkler Rough-in/Hydro | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PART |
Troy Cobbley
|
|
|
See city approved plans for locations of deficiencies. Lower system south end not installed yet. Hydro test passed but was only partial test.
|
INSP-Sprinkler Rough-in/Hydro | 6/2/2005 | 6/3/2005 | 6/3/2005 | A | FAIL |
Troy Cobbley
|
|
|
Plans on job site are only have partial approvals. Updated plans are not on site. Could not do hydro because guage only showed 180lbs of pressure. No inspection done.
|