INSP-Final Inspection | 12/5/2005 | 12/5/2005 | 12/5/2005 | A | PASS |
Forrest France
|
|
|
UG fire supply finaled.
|
INSP-Alarm Testing | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | PASS |
Forrest France
|
|
|
Underground fire supply line permit finaled.
|
INSP-Final Inspection | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | CANC |
Forrest France
|
|
|
Duplicate inspection already called in.
|
INSP-Sprinkler Rough-in | 9/14/2005 | 9/15/2005 | 9/16/2005 | P | PART |
Forrest France
|
|
|
First floor lower office sprinkler rough-in is good for cover, also discussed uprights above drop ceiling at second level and garage door coverage in the warehouse area.
|
INSP-Sprinkler Rough-in/Hydro | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | PART |
Forrest France
|
|
|
Underground fire supply passed hydrostatic test. Still need to perform UG flushing.
|
INSP-Sprinkler Rough-in | 6/22/2005 | 6/23/2005 | 6/23/2005 | A | PART |
Forrest France
|
|
|
Underground fire supply line is approved for cover.
|
INSP-Sprinkler Rough-in | 6/21/2005 | 6/22/2005 | 6/22/2005 | A | FAIL |
Forrest France
|
|
|
Fail, underground pipe has been buried prior to inspection for cover. Expose pipe and call for a re-inspect.
|
INSP-Sprinkler Rough-in | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | FAIL |
Forrest France
|
|
|
Underground piping must meet min. depth of bury req. NFPA 10.4.1, backfill at rock per 10.9.4, support per 10.7.9, distance from embankment per 10.5.4, and meet deflection requirements. The pipe laid over the large section of embeded rock in the trench fails to meet code standards and requirements.
|
INSP-Sprinkler Rough-in | 6/13/2005 | 6/13/2005 | 6/13/2005 | P | PART |
Forrest France
|
|
|
Underground fire supply line riser piece and 5' stub out OK to cover. Still need provision for EQ clearance through floor slab.
|