INSP-Final Inspection | 10/9/2006 | 10/10/2006 | 10/10/2006 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/5/2006 | 10/6/2006 | 10/6/2006 | A | CANC |
Troy Cobbley
|
|
|
No time left in day for inspection
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2006 | 9/11/2006 | 9/11/2006 | P | PART |
Forrest France
|
|
|
AG hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/7/2006 | 9/8/2006 | 9/8/2006 | P | CANC |
Troy Cobbley
|
|
|
No time for the hydro test today
|
INSP-Sprinkler Rough-in | 4/11/2006 | 4/12/2006 | 4/13/2006 | A | PART |
Forrest France
|
|
|
Reducing bushing near the first floor riser and above the 3rd floor southeast master bathroom are not engaged properly in the fitting socket , elevator shaft heads are not installed at this time, the 2nd floor riser main is exposed in a closet-need to conceal or provide protection, possible light fixture obstruction at the 2nd floor west elevator lobby, no cover is allowed on the 3rd floor until a tenting inspection has been completed for cold cavity protection.
|
INSP-Sprinkler Rough-in | 4/10/2006 | 4/11/2006 | 4/11/2006 | P | CANC |
Forrest France
|
|
|
No time available for this inspection today, to be rescheduled per agreement with contractor.
|
INSP-Sprinkler Rough-in/Hydro | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PART |
Forrest France
|
|
|
UG rough-in resubmit, hydro test, and flushing preformed satisfactory.
|
INSP-Supply line flush | 6/30/2005 | 6/30/2005 | 6/30/2005 | P | PART |
Forrest France
|
|
|
UG flush is okay.
|
INSP-Supply line flush | 6/15/2005 | 6/16/2005 | 6/16/2005 | P | FAIL |
Forrest France
|
|
|
Installation does not match approved plans, pipe routing has been changed significantly.
|