Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR05-00273
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2440 -2494 N BOGUS BASIN RD
Project NameSPR HIGHLANDS VILLAGE BLD 9
Customer Number 
ePlanReview 
Description
HIGHLANDS VILLAGE BLD #9 * 2440, 2442, 2492 & 2494 N. Bogus Basin Rd. To install overhead fire sprinkler protection throughout a new 13,266-ft/2 three story, four unit apartment building. The first floor is 4,346-ft/2 of which 2,912-ft/2 is for the garages (protected to Ordinary Group design) and the remaining is common area, (Light Hazard design). The second floor is 4,440-ft/2 and the third floor is 4,440-ft/2. These residential floors will be protected with a 13R design. Each unit on the second and third floors are single story units. This building is fire sprinklered per NFPA 13R for story increase. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work. The underground fire service supply was installed under FIR04-00495. This permit is attached to building permit: BLD04-00944.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/21/20063/22/20063/22/2006APASS
DetailsForrest France
c/n items have been completed, fire sprinkler permit passed inspection.
INSP-Final Inspection3/16/20063/17/20063/17/2006APART
DetailsForrest France
Items on previous correction notice have been completed, per state elevator requirements the wood framed sheetrocked shaft is considered combustible and will require a sprinkler at the top.
INSP-Final Inspection3/10/20063/16/20063/16/2006AFAIL
DetailsForrest France
Missing escutcheons at some locations, provide flex coupling at riser, provide tags on riser, certify backflow preventer, sprinkler related alarms to be verified at next alarm inspection.
INSP-Final Inspection9/30/20059/30/20059/30/2005PFAIL
DetailsForrest France
The resubmitted plans for field changes still do not match the installation as required, the first floor main and riser room locations are not accurate showing on opposite sides of the building from the actual install.
INSP-Sprinkler Rough-in/Hydro8/30/20058/31/20058/31/2005PPART
DetailsForrest France
3rd floor (4 dormers) addition and full hydro test.
rick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
INSP-Sprinkler Rough-in8/24/20058/25/20058/25/2005AFAIL
DetailsForrest France
First floor piping does not match approved drawings due to several field changes that have been made, resubmit plans reflecting the actual installation for approval prior to field inspection, the second floor rough-in is good for cover, the third floor master bedrooms each have low soffits affecting proper coverage and response time.
INSP-Supply line flush6/30/20056/30/20056/30/2005PCANC
DetailsForrest France
Wrong permit number called in, this inspection was for UG under permit fir04-00495.
INSP-Sprinkler Rough-in/Hydro6/30/20056/30/20056/30/2005PCANC
DetailsForrest France
Wrong permit number called in, this inspection was for UG under permit fir04-00495.