Permit Information
Permit NumberFIR05-00344
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 301 S CAPITOL BLVD
Project NameBODO BUILDING 7 SPR
Customer Number 
ePlanReview 
Description
BoDo - Building #7 (Shell-Hanger Locations) - This is a scope of work permit. To verifying the attachment connections of different methods of hangers, and (possibly) braces for securing fire sprinkler piping in a new 135,950-ft/2, three story, noncombustible, fully fire sprinklered shell building for future multi-plex theater, offices, retail and restaurant tenants. This work is fire proof coating of the new structures exposed pan and beams being constructed. The fire sprinkler system is being used for area increase. This related to the shell permit only. Separate permit submittals required for shell system and tenant improvements to finish this building for occupancy. The fire sprinkler related work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-00344.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/5/20064/5/20064/5/2006PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection11/10/200511/10/200511/10/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanniman's permission. Items needing correction include the east and west projector rooms need to be designed/spaced for OH2, the roof access hatch requires protection, the storage room next to the managers office needs to be OH2, pendant over the escalator in the east entry lobby is overspaced 196 max, submit the correcte plans including the concession area, replace the missing canopy in the lobby/womens restroom and patch hole and remove all storage from the projection room. All of the items need to be corrected within 30 days.
INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005PCANC
DetailsForrest France
Contact Matt. R-in and Hydro.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro6/16/20056/16/20056/16/2005PPART
DetailsForrest France
Beam clamps and retaining straps on hangers in theaters verified, two hangers missing straps and one hanger with strap not attatched to beam....these hangers were corrected while on site.