INSP-Final Inspection | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | PASS |
Forrest France
|
|
|
Ceiling tile at the heads, escutcheons, and spare heads in the head box have been installed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | PART |
Forrest France
|
|
|
Overhead rough-in is okay to cover.
|
INSP-Final Inspection | 8/30/2005 | 8/31/2005 | 8/31/2005 | P | CANC |
Forrest France
|
|
|
Jonathan is the contact on this job. Thank you; Phone #: ###-#### Internet Inspection Request from: Trent Bice
Contractor not available at site.
|
INSP-Final Inspection | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | FAIL |
Troy Cobbley
|
|
|
Plans do not match floor layout. Resubmittals required. Per Bill Alexander coverage not required above the soffit as discussed.
|