Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR05-00401
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1100 S VISTA AVE
Project NameSPR VISTA VILLAGE-PHASE I
Customer Number 
ePlanReview 
Description
VISTA VILLAGE SHOPPING CENTER (RITE AID-BUILDING D) * To add fire sprinklers from an added antifreeze system, connected to the existing system for a new front facade/canopy being constructed on an existing, single story, CMU exterior wall, Type V-B, retail building. The old canopy protection piping was demoed under FIR05-00242. This building is fire sprinklered for area increase. The fire sprinkler system work shall comply with the IFC 2000, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD05-02461.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/16/20102/16/20102/16/2010APASS
DetailsForrest France
Fire sprinkler permit okay for final- required alarm work finished via project related FIR07-00116.
INSP-Final Inspection1/17/20061/17/20061/18/2006PNR
DetailsForrest France
Per contractor not ready for final inspection. The control valves for the antifreeze system must be monitored by the fire alarm panel, connection will require a FA permit.
INSP-Sprinkler Rough-in/Hydro7/27/20057/27/20057/27/2005PPART
DetailsForrest France
Overhead rough-in for antifreeze system at front canopy is acceptable to cover.
INSP-Sprinkler Rough-in/Hydro7/27/20057/27/20057/27/2005PPART
DetailsForrest France
Overhead hydrostatic test of antifreeze system at front canopy is satisfactory.
INSP-Sprinkler Rough-in/Hydro7/26/20057/26/20057/26/2005PFAIL
DetailsForrest France
Pendent heads along storefront canopy do not meet OH2 spacing requirements dictated by this occupant type and use for this specific area (see review notes- re-submittals req. for any changes), EQ attatchments in wood truss members must be through bolted, attic heads along sloped ceilings must orient deflector with the slope, perform hydrostatic test when system is complete and changes have been made.