INSP-Final Inspection | 3/10/2006 | 3/10/2006 | 3/10/2006 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 3/9/2006 | 3/10/2006 | 3/10/2006 | A | PART |
Forrest France
|
|
|
All areas inspected are satisfactory, final pending replacement of one painted head in the restroom (see enlarged detail E for location), and installation of missing escutcheons at the restroom and office area at the end of the NE wing.
|
INSP-Final Inspection | 3/8/2006 | 3/9/2006 | 3/9/2006 | P | DEFR |
Forrest France
|
|
|
No time for this inspection today, to be rescheduled per conversation with contractor for 3/10 in the am.
|
INSP-Final Inspection | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | NR |
Forrest France
|
|
|
Per phone conversation with Brad of TVFP the project is not ready for inspection at this time.
|
INSP-Sprinkler Rough-in | 9/29/2005 | 9/30/2005 | 9/30/2005 | A | PART |
Forrest France
|
|
|
Relocated heads in storage room 132, EQ bracing in corridor, and head at north entry vestibule are acceptable.
|
INSP-Sprinkler Rough-in | 8/11/2005 | 8/11/2005 | 8/12/2005 | P | PART |
Troy Cobbley
|
|
|
Sprinkler rough-in as shown on the city plans is ok. Pendant head at north entry into large room needs to match existing. Earth quake bracing is lacking in the north end. Per the approved plans, Design Hazard/Limitiations, this permit shall meet the minimum requirements of the International FIre Code. The entire sprinkler system shall meet the code requirements under which it was installed and if it doesn't it must be brought up to current code. This is for all aspects of the sprinkler system including but not limited to hangers, EQ bracing and sprinkler spacing.
|